Report on DOT Significant Rulemakings

10 page views

Table of Contents

Federal Aviation Administration

1. Qualification, Service, and Use of Crewmembers and Aircraft Dispatchers

2. Supercooled Large Droplet Icing Conditions

3. Airport Safety Management System

4. Photo Requirements for Pilot Certificates

5. Air Ambulance and Commercial Helicopter Operations; Safety Initiatives and Miscellaneous Amendments

6. Flight and Duty Time Limitations and Rest Requirements

7. Operation and Certification of Small Unmanned Aircraft Systems (sUAS)

8. Repair Stations

9. Pilot Certification and Qualification Requirements (formerly First Officer Qualification Requirements) (HR 5900)

10. Prohibition Against Certain Flights Within the Territory and Airspace of Afghanistan

11. Requirement for Wildlife Assessments at Certificated Airports

12. Regulation Of Flight Operations Conducted By Alaska Guide Pilots

13. Air Carrier Maintenance Training Program

14. Installed Systems And Equipment for Use by the Flight Crew

15. Safety Management Systems for Part 121 Certificate Holders

16. Flight Crewmember Mentoring, Leadership and Professional Development (HR 5900)

17. New York Congestion Management Rule for LaGuardia Airport, John F. Kennedy International Airport, and Newark Liberty International Airport

18. Lavatory Oxygen Systems

19. Part 121 Exiting Icing

Federal Highway Administration

20. National Tunnel Inspection Standards

21. Lane Line Retroreflectivity

22. National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Engineering Judgments (RRR)

23. National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Compliance Dates Revision (RRR)

Federal Motor Carrier Safety Administration

24. Unified Registration System

25. Application by Certain Mexico-Domiciled Motor Carriers to Operate Beyond U.S. Municipalities and Commercial Zones on the U.S.-Mexico Border

26. Safety Monitoring System and Compliance Initiative for Mexico-Domiciled Motor Carriers Operating in the United States

27. Certification of Safety Auditors, Safety Investigators, and Safety Inspectors

28. Limitations on the Issuance of Commercial Driver Licenses with a Hazardous Materials Endorsement

29. Qualifications of Drivers; Diabetes Standard

30. National Registry of Certified Medical Examiners

31. Consumer Complaint Information

32. Minimum Training Requirements for Entry Level Commercial Motor Vehicle Operations

33. Carrier Safety Fitness Determination

34. New Entrant Safety Assurance Process: Implementation of Section 210(b) of the Motor Carrier Safety Improvement Act of 1999

35. Commercial Driver's License Drug and Alcohol Clearinghouse

36. Electronic On-Board Recorders and Hours of Service Supporting Documents

37. Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report for Intermodal Equipment (RRR)

38. Medical Examiner's Certification Integration

39. Patterns of Safety Violations by Motor Carrier Management

40. Lease and Interchange of Vehicles; Commercial Motor Vehicles Designed to Transport Passengers

Federal Railroad Administration

41. Critical Incident Stress Plan; "Critical Incident" Definition

42. Training Standards for Railroad Employees (RRR)

43. Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations (RRR)

44. Alcohol and Controlled Substance Testing for Maintenance-of-Way Employees

45. Risk Reduction Program (RRR)

46. Emergency Escape Breathing Apparatus (RRR)

47. High-Speed Rail Corridor Development and Capital Investment Grants to Support Intercity Passenger Rail Service

48. High-Speed Intercity Passenger Rail (HSIPR) Program; Buy America Program Requirements

49. Medical Standards for Certified Locomotive Engineers and Conductors

50. Positive Train Control Systems Amendments (RRR)

51. Railroad System Safety Program

52. Positive Train Control Systems: De Minimis Exception, Yard Movements, En Route Failures; Miscellaneous Grade Crossing/Signal and Train Control Amendments (RRR)

Federal Transit Administration

53. Capital Project Management

54. Bus Testing: Updating Testing Procedures

55. Major Capital Investment Projects (RRR)

56. Environmental Impact and Related Procedures (RRR)

Maritime Administration

57. Regulations To Be Followed by All Departments, Agencies and Shippers Having Responsibility To Provide a Preference for U.S.-Flag Vessels in the Shipment of Cargoes on Ocean Vessels (RRR)

National Highway Traffic Safety Administration

58. FMVSS No. 124, Accelerator Control Systems Upgrade

59. Federal Motor Vehicle Safety Standard No. 111, Rearview Mirrors (RRR)

60. Require Installation of Seat Belts on Motorcoaches, FMVSS No. 208

61. Alternative Fuel Vehicle Badging and Fuel Compartment Labels on Alternative Fuel Usage

62. Tire Fuel Efficiency Consumer Information - Part 2

63. Passenger Car and Light Truck Corporate Average Fuel Economy Standards MYs 2017 and Beyond (RRR)

64. Mandatory Part 563 Event Data Recorder Requirements (RRR)

65. Upgrade of Event Data Recorder Requirements

66. Heavy Vehicle Speed Limiters

67. Sound for Hybrid and Electric Vehicles

68. Motorcoach Rollover Structural Integrity

69. Electronic Stability Control Systems for Heavy Vehicles

70. FMVSS No. 218 and Enforcement Policy Concerning Novelty Helmets

71. Part 571 FMVSS No. 205, Glazing Materials, GTR (RRR)

Office of the Secretary

72. Protection of Sensitive Security Information

73. Prioritization and Allocation Authority Exercised By the Secretary of Transportation Under the Defense Production Act

74. Use of the Seat-Strapping Method for Carrying a Wheelchair on an Aircraft

75. Stowage of Wheelchairs, other Mobility Aids and other Assistive Devices

76. Accessibility of Airports

77. Accessibility of Carrier Websites and Ticket Kiosks

78. Smoking of Electronic Cigarettes On Commercial Aircraft

79. Enhancing Airline Passenger Protections III

80. Carrier-Supplied Medical Oxygen, Accessible In-Flight Entertainment Systems, Service Animals, and Accessible Lavatories on Single-Aisle Aircraft

81. Transportation for Individuals with Disabilities: Reasonable Modification

Pipeline and Hazardous Materials Safety Administration

82. Hazardous Materials; Combination Packages Containing Liquids Intended for Transport by Aircraft

83. Hazardous Materials: Bulk Loading and Unloading Operations

84. Pipeline Safety: Enforcement of State Excavation Damage Laws

85. Hazardous Materials: Revisions to Requirements for the Transportation of Lithium Batteries

86. Hazardous Materials: Combustible Liquids

87. Hazardous Materials: Safety Requirements for External Product Piping on Cargo Tanks Transporting Flammable Liquids (Wetlines)

88. Pipeline Safety: Safety of On-Shore Liquid Hazardous Pipelines

89. Hazardous Materials: Revision of Requirements for Fireworks Approvals

90. Pipeline Safety: Excess Flow Valves In Applications Other Than Single-Family Residences in Gas Distribution Systems

91. Pipeline Safety: Gas Transmission

92. Hazardous Materials: Miscellaneous Amendments (RRR)

93. Hazardous Materials: Miscellaneous Pressure Vessel Requirements (DOT Spec Cylinders) (RRR)

94. Hazardous Materials: Reverse Logistics (RRR)

95. Hazardous Materials: Harmonization with the UN Recommendations, International Maritime Dangerous Goods Code, and International Civil Aviation Organization Technical Instructions, Response to Appeals; Clarifications; Corrections

Research and Innovative Technology Administration

96. Reporting Ancillary Airline Passenger Revenues



Federal Aviation Administration

Federal Aviation Administration
1. 
Qualification, Service, and Use of Crewmembers and Aircraft Dispatchers Red
Popular Title: Part 121, Subparts N and O
RIN 2120-AJ00
Stage: SNPRM
Previous Stage: NPRM: Publication Date 01/12/2009;End of Comment Period 05/12/2009;Extension of Comment Period 04/20/2009;End of Extended of Comment Period 08/10/2009.
Abstract: This rulemaking would amend the regulations for crewmember and dispatcher training programs in domestic, flag, and supplemental operations. The rulemaking would enhance traditional training programs by requiring the use of flight simulation training devices for flight crewmembers and including additional training requirements in areas that are critical to safety. The rulemaking would also reorganize and revise the qualification and training requirements. The changes are intended to contribute significantly to reducing aviation accidents.
Effects:
  Regulatory Flexibility Act
Information Collection
Prompting action: None
Legal Deadline:  Final rule : 01/19/2013
Rulemaking Project Initiated: 03/12/1999
Docket Number: FAA-2008-0677
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/26/2010  05/27/2010  05/27/2010 
Returned to Mode     06/18/2010 
Resubmitted to OST   08/27/2010  08/19/2010 
Returned to Mode/2     09/29/2010 
Resubmitted to OST/2   10/08/2010  10/08/2010 
To OMB 03/12/2010  11/16/2010  11/29/2010 
OMB Clearance 04/09/2010  04/01/2011  04/21/2011 
Publication Date 04/20/2010  05/20/2011  05/20/2011 
End of Comment Period 06/21/2010  07/19/2011  07/19/2011 
Extension of Comment Period     06/23/2011 
End of Extended Comment Period     09/19/2011 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for SNPRM: 76FR29336


Federal Aviation Administration
2. 
Supercooled Large Droplet Icing Conditions Red
Popular Title: Supercooled Large Droplet Icing Conditions
RIN 2120-AJ34
Stage: Final Rule
Previous Stage: NPRM: Publication Date 6/29/2010; End of Comment Period 08/30/2010; Publication of Extended Comment Period 08/16/2010; End of Extended Comment Period 9/29/2010.
Abstract: This rulemaking would amend the airworthiness standards applicable to certain transport category airplanes certificated for flight in icing conditions and the icing airworthiness standards applicable to certain aircraft engines. The rulemaking would improve safety by addressing supercooled large drop icing conditions for transport category airplanes most affected by supercooled large drop icing conditions, mixed phase and ice crystal conditions for all transport category airplanes, and supercooled large drop, mixed phase, and ice crystal icing conditions for all turbine engines. This rulemaking is the result of information gathered from a review of icing accidents and incidents.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline:  Final Rule : 11/29/2012
Rulemaking Project Initiated: 02/04/2008
Docket Number: FAA-2010-0636
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/20/2011  10/02/2012   
To OMB 10/21/2011  11/02/2012   
OMB Clearance 01/20/2012  02/01/2013   
Publication Date 02/06/2012  02/19/2013   
Explanation for any delay: Other, higher priorities
Federal Register Citation for Final Rule: None


Federal Aviation Administration
3. 
Airport Safety Management System Red
Popular Title: Airport SMS
RIN 2120-AJ38
Stage: NPRM
Previous Stage: NPRM: Publication Date 10/07/2010;End of Comment Period 01/05/2011;Extension of Comment Period 12/10/2010;End of Extended of Comment Period 03/07/2011;Extension of Comment Period 03/07/2011;End of Extended of Comment Period 07/05/2011.
Abstract: This rulemaking would require airport operators to institute a safety management system at their airports. This action is necessary to improve safety through conformance with best practices in risk management and promote international harmonization with ICAO standards. The rule is intended to facilitate integration of formal risk management processes within the airport´s day-to-day operations.
Effects:
  Information Collection
Peer Review
Prompting action: None
Legal Deadline:  Final rule : 11/05/2012
Rulemaking Project Initiated: 07/22/2008
Docket Number: FAA-2010-0997
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/17/2010  04/27/2010  04/27/2010 
To OMB 03/18/2010  06/18/2010  06/17/2010 
OMB Clearance 06/18/2010  09/20/2010  09/28/2010 
Publication Date 07/02/2010  10/12/2010  10/07/2010 
End of Comment Period 10/04/2010  01/05/2011  01/05/2011 
Publication Date for Extension of Comment Period     12/10/2010 
End of Extended of Comment Period     03/07/2011 
Extension of Comment Period/2     03/07/2011 
End of Extension of Comment Period/2     07/05/2011 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: 75 FR 62008


Federal Aviation Administration
4. 
Photo Requirements for Pilot Certificates Red
Popular Title: Photo Requirements
RIN 2120-AJ42
Stage: Final Rule
Previous Stage: NPRM: Publication Date 11/19/2010; End of Comment Period 02/17/2011
Abstract: This rulemaking would require digital photos on all pilot certificates. This action is necessary to update regulations about pilot plastic certificates. The intended effect of this action is to meet all requirements of the Intelligence Reform and Terrorism Prevention Act.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 09/30/2008
Docket Number: FAA-2010-1127
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/11/2012  02/01/2013   
To OMB 02/13/2012  03/01/2013   
OMB Clearance 05/14/2012  05/31/2013   
Publication Date 05/29/2012  06/13/2013   
Explanation for any delay: Other, higher priorities
Federal Register Citation for Final Rule: None


Federal Aviation Administration
5. 
Air Ambulance and Commercial Helicopter Operations; Safety Initiatives and Miscellaneous Amendments Red
Popular Title: Helicopter Safety Initiatives and Misc Amendments
RIN 2120-AJ53
Stage: Final Rule
Previous Stage: NPRM: Publication Date 10/12/2010; End of Comment Period 01/01/2011.
Abstract: This rulemaking would change equipment and operating requirements for commercial helicopter operations, including many specifically for helicopter air ambulance operations. This rulemaking is necessary to increase crew, passenger, and patient safety. The intended effect is to implement National Transportation Safety Board, Aviation Rulemaking Committee, and internal FAA recommendations.
Effects:
  Regulatory Flexibility Act
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline:  Final rule : 05/10/2012
Rulemaking Project Initiated: 04/15/2009
Docket Number: FAA-2010-0982
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/04/2012  03/06/2012   
To OMB 02/06/2012  04/06/2012   
OMB Clearance 05/03/2012  07/05/2012   
Publication Date 05/21/2012  07/26/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Aviation Administration
6. 
Flight and Duty Time Limitations and Rest Requirements Red
Popular Title: Flight/Duty/Rest Requirements
RIN 2120-AJ58
Stage: Final Rule
Previous Stage: NPRM: Publication Date 09/14/2010;End of Comment Period 11/15/2010. Final rule: Publication Date 01/04/2012.
Abstract: This rulemaking would amend existing flight, duty, and rest regulations applicable to certificate holders and their flightcrew members operating under 14 CFR part 121. The new requirements would eliminate the current distinctions between domestic, flag, and supplemental operations. Also, the rulemaking would provide different requirements based on the time of day, whether an individual is acclimated to a new time zone, and the likelihood of being able to sleep under different circumstances. This rulemaking is necessary to improve aviation safety by providing applicable persons with the opportunity for sufficient rest.
Effects:
  Economically Significant
Major
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline:  Final Rule : 08/01/2011
Rulemaking Project Initiated: 06/24/2009
Docket Number: FAA-2009-1093
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/27/2011    07/08/2011 
To OMB 06/13/2011  08/08/2011  08/17/2011 
OMB Clearance 07/28/2011  12/16/2011  12/20/2011 
Publication Date 08/08/2011  01/04/2012  01/04/2012 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: 77 FR 330


Federal Aviation Administration
7. 
Operation and Certification of Small Unmanned Aircraft Systems (sUAS) Red
Popular Title: Small Unmanned Aircraft
RIN 2120-AJ60
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would enable small unmanned aircraft to safely operate in limited portions of the national airspace system (NAS). This action is necessary because it addresses the novel legal or policy issues about the minimum safety parameters for operating recreational remote control model and toy aircraft in the NAS. The intended effect of this action is to develop requirements and standards to ensure that risks are adequately mitigated, such that safety is maintained for the entire aviation community.
Effects:
  Regulatory Flexibility Act
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 07/28/2009
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/24/2011  09/02/2011  08/29/2011 
Returned to Mode     12/27/2011 
Resent to OST   12/30/2011  12/30/2011 
To OMB 02/03/2011  01/30/2012   
OMB Clearance 03/07/2011  04/30/2012   
Publication Date 03/10/2011  05/10/2012   
End of Comment Period 07/14/2011  08/10/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Aviation Administration
8. 
Repair Stations Red
Popular Title: Repair Stations
RIN 2120-AJ61
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would update and revise the regulations for repair stations. The action is necessary because many portions of the current regulations do not reflect current repair station business practices, aircraft maintenance practices, or advances in aircraft technology.
Effects:
  Regulatory Flexibility Act
Federalism
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 06/26/2008
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/09/2010  07/08/2011  07/13/2011 
Returned to Mode     12/27/2011 
To OMB 08/09/2010  02/27/2012   
OMB Clearance 11/08/2010  05/29/2012   
Publication Date 11/29/2010  06/19/2012   
End of Comment Period 02/22/2011  09/19/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Aviation Administration
9. 
Pilot Certification and Qualification Requirements (formerly First Officer Qualification Requirements) (HR 5900) Red
Popular Title: Pilot Certification and Qualification Requirements
RIN 2120-AJ67
Stage: NPRM
Previous Stage: ANPRM: Publication Date 02/08/2010; End of Comment Period 04/09/2010
Abstract: This rulemaking would amend the eligibility and qualification requirements for pilots engaged in part 121 air carrier operations. Additionally, it would modify the requirements for an airline transport pilot certificate. These actions are necessary because recent airline accidents and incidents have brought considerable attention to the experience level and training of air carrier flight crews.
Effects:
  None
Prompting action: Statute
Legal Deadline:  NPRM : 01/28/2011
Rulemaking Project Initiated: 10/20/2009
Docket Number: FAA-2010-0100
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/08/2010  01/26/2011  01/26/2011 
To OMB 12/21/2010  05/20/2011  06/23/2011 
OMB Clearance 01/21/2011  01/20/2012   
Publication Date 01/28/2011  02/02/2012   
End of Comment Period 04/28/2011  04/02/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Aviation Administration
10. 
Prohibition Against Certain Flights Within the Territory and Airspace of Afghanistan Red
Popular Title: Afghanistan SFAR
RIN 2120-AJ69
Stage: Final Rule
Previous Stage: NPRM: Publication Date 05/26/2010;End of Comment Period 06/10/2010.
Abstract: This rulemaking would prohibit flight operations below flight level (FL) 160 within the territory and airspace of Afghanistan by all: U.S. air carriers; U.S. commercial operators; persons exercising the privileges of a U.S. airman certificate, except if the flight is on behalf of a foreign air carrier; and operators of U.S.-registered aircraft, except when such operators are foreign air carriers. The FAA finds this action necessary to prevent a potential hazard to persons and aircraft in engaged in such flight operations.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 01/08/2010
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/07/2010  03/25/2011  03/21/2011 
To OMB 09/14/2010  04/26/2011  05/17/2011 
OMB Clearance 09/21/2010  01/30/2012   
Publication Date 09/30/2010  02/10/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for Final Rule: None


Federal Aviation Administration
11. 
Requirement for Wildlife Assessments at Certificated Airports Red
Popular Title: Wildlife Hazard Assessment (WHA)
RIN 2120-AJ71
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would require a Wildlife Hazard Assessment (scientific evaluation of wildlife populations and their attractants) for certificated airports. This rulemaking would also require periodic completion of a wildlife hazard assessment, or continuous wildlife monitoring as an alternative to the assessment, and clarify requirements for those conducting an assessment. This rulemaking is intended to decrease direct hazards (animals striking aircraft) and indirect hazards (animal burrowing and nesting in or near aircraft or aircraft operations areas).
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 03/02/2010
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/15/2011  05/16/2011  05/11/2011 
Returned to Mode     06/01/2011 
Resubmitted to OST   01/17/2012   
To OMB 03/17/2011  01/17/2012   
OMB Clearance 06/14/2011  05/04/2012   
Publication Date 06/24/2011  05/04/2012   
End of Comment Period 09/22/2011  08/06/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Aviation Administration
12. 
Regulation Of Flight Operations Conducted By Alaska Guide Pilots Red
Popular Title: Alaska Guide Pilots
RIN 2120-AJ78
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish general operating and flight rules applicable to the flight operations conducted by Alaska guide pilots. The rulemaking would implement the Wendell H. Ford Aviation Investment and Reform Act for the 21st Century.
Effects:
  Regulatory Flexibility Act
Information Collection
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 05/04/2010
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/14/2011  02/06/2013   
To OMB 01/13/2012  03/06/2013   
OMB Clearance 04/13/2012  06/06/2013   
Publication Date 04/24/2012  06/18/2013   
End of Comment Period 07/24/2012  09/18/2013   
Explanation for any delay: Other, higher priorities
Federal Register Citation for NPRM: None


Federal Aviation Administration
13. 
Air Carrier Maintenance Training Program Red
Popular Title: Air Carrier Maintenance Training
RIN 2120-AJ79
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would require FAA approval of maintenance training programs of air carriers that operate aircraft type certificated for a passenger seating configuration of 10 seats or more (excluding any pilot seat). The intent of this rulemaking is to reduce the number of accidents and incidents caused by human error, improper maintenance, inspection, or repair practices.
Effects:
  Regulatory Flexibility Act
Prompting action: Statute
Legal Deadline:  Final Rule : 09/26/2012
Rulemaking Project Initiated: 10/28/2008
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/25/2011  07/12/2011  06/03/2011 
Returned to Mode   06/14/2011  06/23/2011 
Resubmitted to OST   08/08/2011  08/29/2011 
Returned to Mode/2     12/27/2011 
Resent to OST   01/13/2012   
To OMB 02/24/2011  02/13/2012   
OMB Clearance 05/24/2011  05/14/2012   
Publication Date 06/01/2011  06/04/2012   
End of Comment Period 08/30/2011  09/04/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Aviation Administration
14. 
Installed Systems And Equipment for Use by the Flight Crew Black
Popular Title: Human Factors in A/C Design
RIN 2120-AJ83
Stage: Undetermined
Previous Stage: NPRM: Publication Date 02/03/2011; End of Comment Period 04/04/2011.
Abstract: This rulemaking would amend design requirements in the airworthiness standards for transport category airplanes in an effort to minimize the occurrence of design-related flightcrew errors. The new design requirements would enable flightcrews to detect and manage their errors when the errors occur. This action would establish uniform airworthiness design standards in the U.S. and Europe. This rulemaking was recently upgraded.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 07/06/2010
Docket Number: FAA-2010-1175
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Federal Aviation Administration
15. 
Safety Management Systems for Part 121 Certificate Holders Green
Popular Title: SMS for Part 121
RIN 2120-AJ86
Stage: Final Rule
Previous Stage: NPRM: Publication Date 11/05/2010; End of Comment Period 02/03/2011; Extended Comment Period 01/31/2011; End of Extended Comment Period 03/07/2011.
Abstract: This rulemaking would require each certificate holder operating under 14 CFR part 121 to develop and implement a safety management system (SMS) to improve the safety of its aviation related activities. A safety management system is a comprehensive, process-oriented approach to managing safety throughout an organization. An SMS includes an organization-wide safety policy; formal methods for identifying hazards, controlling, and continually assessing risk and safety performance; and promotion of a safety culture. SMS stresses not only compliance with technical standards but increased emphasis on the overall safety performance of the organization.
Effects:
  Regulatory Flexibility Act
Prompting action: Statute
Legal Deadline:  Final Rule : 07/30/2012
NPRM : 10/29/2010
Rulemaking Project Initiated: 08/01/2010
Docket Number: FAA-2009-0671
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/16/2012     
To OMB 04/16/2012     
OMB Clearance 07/16/2012     
Publication Date 07/27/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Aviation Administration
16. 
Flight Crewmember Mentoring, Leadership and Professional Development (HR 5900) Red
Popular Title: Flight Crewmember Mentoring
RIN 2120-AJ87
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would amend the regulations for air carrier training programs under part 121. The action is necessary to ensure that air carriers establish or modify training programs that address mentoring, leadership, and professional development of flight crewmembers in part 121 operations. The amendments are intended to contribute significantly to airline safety by reducing aviation accidents.
Effects:
  None
Prompting action: Statute
Legal Deadline:  NPRM : 07/29/2011
Rulemaking Project Initiated: 08/01/2010
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/29/2011    03/29/2011 
To OMB 04/29/2011  05/16/2011  05/17/2011 
OMB Clearance 07/29/2011  01/17/2012   
Publication Date 07/29/2011  01/26/2012   
End of Comment Period 10/26/2011  04/26/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Aviation Administration
17. 
New York Congestion Management Rule for LaGuardia Airport, John F. Kennedy International Airport, and Newark Liberty International Airport Red
Popular Title: NY Congestion Management
RIN 2120-AJ89
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would replace the current temporary orders limiting scheduled operations at LaGuardia Airport, John F. Kennedy International Airport, and Newark Liberty International Airport with a more permanent rule to address the issues of congestion and delay at the New York area´s three major commercial airports, while also promoting fair access and competition. The rulemaking would help ensure that congestion and delays are managed by limiting scheduled and unscheduled operations. The rulemaking would also establish a secondary market for U.S. and foreign air carriers to buy, sell, trade, and lease slots amongst each other at each of the three airports. This would allow carriers serving or seeking to serve the New York area airports to exchange slots as their business models and strategic goals require.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 10/21/2010
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/25/2011  06/22/2011  06/22/2011 
To OMB 04/25/2011  03/06/2012   
OMB Clearance 07/25/2011  06/06/2012   
Publication Date 07/29/2011  06/20/2012   
End of Comment Period 10/27/2011  09/20/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Aviation Administration
18. 
Lavatory Oxygen Systems Green
Popular Title: Lavatory Oxygen Systems
RIN 2120-AJ92
Stage: Interim Final Rule
Previous Stage:None
Abstract: This rulemaking would temporarily authorize variances from existing standards related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 02/14/2011
Docket Number: FAA-2011-0186
Dates for Interim Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/03/2011    03/03/2011 
Publication Date 03/08/2011    03/08/2011 
End of Comment Period 05/09/2011    05/09/2011 
Explanation for any delay: N/A
Federal Register Citation for Interim Final Rule: 76 FR 12550


Federal Aviation Administration
19. 
Part 121 Exiting Icing Red
Popular Title: Part 121 Exiting Icing
RIN 2120-AJ95
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish the standards for when flightcrews need to take action to exit icing conditions. If adopted, this rulemaking would apply to aircraft with a maximum takeoff weight of less than 60,000 pounds. This rulemaking is based on recommendations from an Aviation Rulemaking Advisory Committee working group after reviewing certain accidents and incidents. The intended affect of this action is to avoid similar accidents and incidents in the future. This rulemaking replaces RIN 2120-AJ74, for which an NPRM had originally been scheduled for 11/02/2011. This rulemaking has expanded the scope of RIN 2120-AJ74 to include requirements for design approval holders.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 12/22/2009
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/13/2012     
To OMB 08/17/2012     
OMB Clearance 11/19/2012     
Publication Date 12/03/2012     
End of Comment Period 03/04/2013     
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Federal Highway Administration

Federal Highway Administration
20. 
National Tunnel Inspection Standards Red
Popular Title: Tunnel Inspection
RIN 2125-AF24
Stage: Final Rule
Previous Stage: ANPRM: Publication Date 11/18/08; End of Comment Period 2/17/09. NPRM: Publication Date 7/22/2010; End of Comment Period 09/20/2010.
Abstract: This rulemaking would revise 23 CFR Part 650 -- Bridges, Structures, and Hydraulics, by adding the National Tunnel Inspection Standards (NTIS) under Subpart E. We anticipate that the NTIS may be modeled after the existing National Bridge Inspection Standards and may include requirements for, among other things, inspection procedures, the qualifications and training of inspectors, and a National Tunnel Inventory.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 01/30/2008
Docket Number: FHWA-2008-0038
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/31/2011  09/14/2011  09/13/2011 
To OMB 07/01/2011  02/07/2012   
OMB Clearance 10/03/2011  05/08/2012   
Publication Date 10/14/2011  05/17/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Federal Highway Administration
21. 
Lane Line Retroreflectivity Red
Popular Title: Lane Retroreflectivity
RIN 2125-AF34
Stage: SNPRM
Previous Stage: NPRM: Publication Date 4/22/2010; End of Comment Period 8/20/2010.
Abstract: This rulemaking would amend the Manual on Uniform Traffic Control Devices, incorporated by reference in 23 CFR part 655, subpart F, to include standards, guidance, options, and supporting information relating to maintaining minimum levels of retroreflectivity for pavement markings on all roads open to public travel. We originally scheduled publication of a final rule for 12/30/2011.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 12/07/2009
Docket Number: FHWA-2009-0139
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/06/2012  02/06/2012   
To OMB 02/06/2012  03/06/2012   
OMB Clearance 05/07/2012  06/06/2012   
Publication Date 05/14/2012  06/13/2012   
End of Comment Period 07/14/2012  08/13/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for SNPRM: None


Federal Highway Administration
22. 
National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Engineering Judgments (RRR) Green
Popular Title: MUTCD Engineering Judgment (RRR)
RIN 2125-AF41
Stage: Final Rule
Previous Stage: NPRM: 08/02/2011; End of Comment Period 10/03/2011.
Abstract: This rulemaking would propose changes to the Manual on Uniform Traffic Control Devices (MUTCD) to clarify the definition of "Standard Statements" in the MUTCD and to clarify the use of engineering judgment and studies in the application of traffic control devices.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 12/03/2010
Docket Number: FHWA-2010-170
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/03/2012    02/02/2012 
To OMB 03/02/2012     
OMB Clearance 06/04/2012     
Publication Date 06/15/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Highway Administration
23. 
National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Compliance Dates Revision (RRR) Green
Popular Title: MUTCD Compliance Dates (RRR)
RIN 2125-AF43
Stage: Final Rule
Previous Stage: NPRM: 08/31/11; End of Comment Period: 10/31/11.
Abstract: This rulemaking would revise the Manual on Uniform Traffic Control Devices (MUTCD) to revise the compliance dates for certain requirements in the MUTCD.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 01/20/2011
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/22/2012     
To OMB 03/22/2012     
OMB Clearance 06/22/2012     
Publication Date 06/29/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Motor Carrier Safety Administration

Federal Motor Carrier Safety Administration
24. 
Unified Registration System Red
Popular Title: URS
RIN 2126-AA22
Stage: Final Rule
Previous Stage: ANPRM: Publication Date 08/26/96; End of Comment Period 10/26/96. NPRM: Publication Date 05/19/05; End of Comment Period 08/17/05. SNPRM: Publication Date 10/26/11; End of Comment Period 12/27/11.
Abstract: This rulemaking would replace three current identification and registration systems: the US DOT number identification system, the commercial registration system, and the financial responsibility system, with an online Federal unified registration system (URS). This program would serve as a clearinghouse and depository of information on, and identification of, brokers, freight forwarders, and others required to register with the Department of Transportation. The Agency is revising this rulemaking to address amendments directed by Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The replacement system for the Single State Registration System, which the ICC Termination Act originally directed be merged under URS, was addressed separately in RIN 2126-AB09. The cargo insurance portion of this rulemaking has been split off into RIN 2126-AB21.
Effects:
  Regulatory Flexibility Act
Information Collection
Prompting action: Statute
Legal Deadline:  Final Rule (SAFETEA-LU) : 08/10/2006
Final Rule (ICC Act) : 01/01/1998
Rulemaking Project Initiated: 01/01/1996
Docket Number: FMCSA-97-2349
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/15/2012     
To OMB 09/19/2012     
OMB Clearance 12/20/2012     
Publication Date 12/31/2012     
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for Final Rule: None


Federal Motor Carrier Safety Administration
25. 
Application by Certain Mexico-Domiciled Motor Carriers to Operate Beyond U.S. Municipalities and Commercial Zones on the U.S.-Mexico Border Red
Popular Title: Mexico-Domiciled Motor Carriers
RIN 2126-AA34
Stage: Undetermined
Previous Stage: IFR: Publication Date 03/19/2002; End of Comment Period 04/18/2002.
Abstract: This rulemaking would change FMCSA regulations to govern applications by Mexican carriers to operate beyond municipalities and commercial zones at the United State-Mexico border. It would also revise the application form, OP-1MX, to be filed by these Mexican motor carriers. The revised form would require additional information about the applicant´s business and operating practices to allow the FMCSA to determine if the applicant can meet the safety standards established for operating in interstate commerce in the United States. Carriers that had previously submitted an application would have to submit the updated form. These changes are needed to implement part of the North American Free Trade Agreement (NAFTA). On January 16, 2003, the Ninth Circuit Court remanded this rule, along with two other NAFTA-related rules, to the agency, requiring a full environmental impact statement and an analysis required by the Clean Air Act. On June 7, 2004, the Supreme Court reversed the Ninth Circuit and remanded the case, holding that FMCSA is not required to prepare the environmental documents as ruled by the Ninth Circuit. FMCSA originally planned to publish a final rule by November 20, 2003. FMCSA will determine the next steps to be taken after the pilot program on the long haul trucking provisions of NAFTA is completed.
Effects:
  Information Collection
NAFTA
Prompting action: International Agreement
Legal Deadline: None
Rulemaking Project Initiated: 02/07/2001
Docket Number: FMCSA-98-3298
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
26. 
Safety Monitoring System and Compliance Initiative for Mexico-Domiciled Motor Carriers Operating in the United States Red
Popular Title: Safety Monitoring
RIN 2126-AA35
Stage: Undetermined
Previous Stage: IFR: Publication Date 03/19/2002; End of Comment Period 04/18/2002.
Abstract: This rule would implement a safety monitoring system and compliance initiative designed to evaluate the continuing safety fitness of all Mexico-domiciled carriers within 18 months after receiving a provisional Certificate of Registration or provisional authority to operate in the United States. It also would establish suspension and revocation procedures for provisional Certificates of Registration and operating authority, and incorporate criteria to be used by FMCSA in evaluating whether Mexico-domiciled carriers exercise basic safety management controls. The interim rule included requirements that were not proposed in the NPRM but which are necessary to comply with the FY-2002 DOT Appropriations Act. On January 16, 2003, the Ninth Circuit Court of Appeals remanded this rule, along with two other NAFTA-related rules, to the agency, requiring a full environmental impact statement and an analysis required by the Clean Air Act. On June 7, 2004, the Supreme Court reversed the Ninth Circuit and remanded the case, holding that FMCSA is not required to prepare the environmental documents. FMCSA originally planned to publish a final rule by November 28, 2003. FMCSA will determine the next steps to be taken after the pilot program on the long haul trucking provisions of NAFTA is completed.
Effects:
  Regulatory Flexibility Act
Federalism
Information Collection
NAFTA
Prompting action: International Agreement
Legal Deadline: None
Rulemaking Project Initiated: 02/07/2001
Docket Number: FMCSA-1998-3299
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
27. 
Certification of Safety Auditors, Safety Investigators, and Safety Inspectors Red
Popular Title: Safety Auditors Certification
RIN 2126-AA64
Stage: NPRM
Previous Stage: IFR: Date of Publication 03/19/02; Effective Date 06/17/02; End of Comment Period 05/20/02, IFR: Notice Extending Compliance Date 06/17/02; End of Extended C/P 07/17/02. IFR: Notice of Statutory Compliance Date 12/23/03, Reinstated IFR 1/01/04.
Abstract: This rulemaking would require that any safety inspection, safety audit, or compliance review be conducted by a certified inspector, auditor, or investigator. It is required by section 211 of the Motor Carrier Safety Improvement Act. Based on comments to the Interim Final Rule (IFR), the agency will issue a NPRM that addresses issues not clarified in the IFR.
Effects:
  None
Prompting action: Statute
Legal Deadline:  NPRM : 12/09/2000
Rulemaking Project Initiated: 12/09/1999
Docket Number: FMCSA-2001-11060
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/08/2005  06/18/2012   
To OMB 08/08/2005  07/20/2012   
OMB Clearance 11/07/2005  10/19/2012   
Publication Date 11/14/2005  10/31/2012   
End of Comment Period 01/13/2006  01/01/2013   
Explanation for any delay: Other, higher priorities
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
28. 
Limitations on the Issuance of Commercial Driver Licenses with a Hazardous Materials Endorsement Black
Popular Title: USA PATRIOT Act Rule
RIN 2126-AA70
Stage: Undetermined
Previous Stage: IFR: Publication Date 04/29/2005.
Abstract: This rulemaking would prohibit States from issuing, renewing, transferring or upgrading a commercial driver´s license (CDL) with a hazardous materials endorsement, unless the Transportation Security Administration (TSA) has first conducted a background check on the applicant and determined the applicant does not pose a security risk warranting denial of the hazardous materials endorsement. FMCSA and TSA simultaneously published interim final rules. FMCSA has published another IFR corresponding to TSA´s extension of compliance date. Since this rulemaking conforms to TSA´s rulemaking, the rulemaking is dependent upon TSA action. This action is considered significant because of substantial public and congressional interest, and national security.
Effects:
  NAFTA
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 10/26/2001
Docket Number: FMCSA-2001-11117
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
29. 
Qualifications of Drivers; Diabetes Standard Red
Popular Title: Diabetes Standard
RIN 2126-AA95
Stage: NPRM
Previous Stage: ANPRM: Publication Date 03/17/2006; End of Comment Period 06/15/2006.
Abstract: This rulemaking action would amend FMCSA´s medical qualification standards to allow drivers with insulin-treated diabetes mellitus to operate commercial motor vehicles in interstate commerce, without seeking an exemption from the FMCSRs. This action is required by Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU).
Effects:
  None
Prompting action: Statute
Legal Deadline:  Initiate change : 11/10/2005
Rulemaking Project Initiated: 08/10/2005
Docket Number: FMCSA-2005-23151
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/19/2010  10/09/2012   
To OMB 08/20/2010  11/14/2012   
OMB Clearance 11/19/2010  02/14/2013   
Publication Date 11/30/2010  02/23/2013   
End of Comment Period 01/30/2011  04/23/2013   
Explanation for any delay: Lack of staffing
Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
30. 
National Registry of Certified Medical Examiners Red
Popular Title: National Registry
RIN 2126-AA97
Stage: Final Rule
Previous Stage: NPRM: Publication Date 12/01/08; End of Comment Period 01/30/09.
Abstract: This rulemaking would establish training, testing and certification standards for medical examiners responsible for certifying that interstate commercial motor vehicle (CMV) drivers meet established physical qualifications standards; provide a database (or National Registry) of medical examiners that meet the prescribed standards for use by motor carriers, drivers, and Federal and State enforcement personnel in determining whether a medical examiner is qualified to conduct examinations of interstate truck and bus drivers; and require medical examiners to transmit electronically to FMCSA the name of the driver and a numerical identifier for each driver that is examined. The rulemaking would also establish the process by which medical examiners who fail to meet or maintain the minimum standards would be removed from the National Registry. This action is in response to section 4116 of Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU).
Effects:
  Economically Significant
Major
Unfunded Mandate
Regulatory Flexibility Act
Information Collection
Privacy
Prompting action: Statute
Legal Deadline:  Final Rule : 08/10/2006
Rulemaking Project Initiated: 08/10/2005
Docket Number: FMCSA-2008-0363
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/21/2009  08/01/2011  08/01/2011 
To OMB 01/21/2010  09/23/2011  09/22/2011 
OMB Clearance 04/21/2010  01/27/2012   
Publication Date 05/05/2010  02/03/2012   
Explanation for any delay: Additional coordination necessary
Lack of resources
Unanticipated issues requiring further analysis
Federal Register Citation for Final Rule: None


Federal Motor Carrier Safety Administration
31. 
Consumer Complaint Information Red
Popular Title: Consumer Complaint Information
RIN 2126-AB01
Stage: Final Rule
Previous Stage: NPRM: Publication Date 02/20/2008, End of Comment Period 4/21/2008.
Abstract: The rulemaking would require each motor carrier of household goods to submit a quarterly report of specific identified information regarding complaints that each receives from shippers and consumers to the Agency. This rule responds to Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU).
Effects:
  Information Collection
Privacy
Prompting action: Statute
Legal Deadline:  Report in place : 08/10/2006
Rulemaking Project Initiated: 08/10/2005
Docket Number: FMCSA-2008-0029
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/23/2010  05/21/2012   
To OMB 09/24/2010  06/22/2012   
OMB Clearance 12/24/2010  09/21/2012   
Publication Date 01/07/2011  10/02/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Federal Motor Carrier Safety Administration
32. 
Minimum Training Requirements for Entry Level Commercial Motor Vehicle Operations Red
Popular Title: Entry Level Driver Training
RIN 2126-AB06
Stage: Undetermined
Previous Stage: NPRM: Publication Date 12/26/2007; End of Extended Comment Period 5/23/2008.
Abstract: This rulemaking would require behind-the-wheel and classroom training for persons who must hold a commercial driver´s license to operate commercial motor vehicles. This action is in response to the U.S. Court of Appeals for the District of Columbia Circuit´s December 2005 decision remanding the May 21, 2004, Final Rule, "Minimum Training Requirements for Entry-Level Commercial Motor Vehicle Operators" to the Agency for further consideration. The rulemaking will consider the effectiveness of CMV driver training in reducing crashes, the appropriate types and levels of training that should be mandated, and related costs.
Effects:
  Economically Significant
Major
Federalism
Prompting action: Court Action
Legal Deadline: None
Rulemaking Project Initiated: 04/19/2006
Docket Number: FMCSA-2007-27748
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
33. 
Carrier Safety Fitness Determination Red
Popular Title: Carrier Safety Fitness Determination
RIN 2126-AB11
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would revise 49 CFR Part 385, Safety Fitness Procedures, in accordance with the Agency´s major new initiative, Comprehensive Safety Analysis (CSA). CSA is a new operational model FMCSA plans to implement that is designed to help the Agency carry out its compliance and enforcement programs more efficiently and effectively. Currently, the safety fitness rating of a motor carrier is determined based on the results of a very labor intensive compliance review conducted at the carrier´s place of business. Aside from roadside inspections and new audits, the compliance review is the Agency´s primary intervention. Under CSA, FMCSA would propose to implement a broader array of progressive interventions, some of which allow FMCSA to make contact with more carriers. Through this rulemaking FMCSA would establish safety fitness determinations based on safety data from crashes, inspections, and violation history rather than just the standard compliance review. This will enable the Agency to assess the safety performance of a greater segment of the motor carrier industry with the goal of further reducing large truck and bus crashes and fatalities.
Effects:
  Major
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 06/21/2007
Docket Number: FMCSA-2004-18898
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 11/12/2007  10/02/2009  09/25/2009 
Withdrawn from OST   03/22/2010  03/22/2010 
Resubmitted to OST   03/16/2012   
To OMB 12/15/2007  04/18/2012   
OMB Clearance 03/15/2008  07/18/2012   
Publication Date 03/29/2008  07/27/2012   
End of Comment Period 06/29/2008  09/28/2012   
Explanation for any delay: Additional coordination necessary
Awaiting development of additional data
Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
34. 
New Entrant Safety Assurance Process: Implementation of Section 210(b) of the Motor Carrier Safety Improvement Act of 1999 Black
Popular Title: MCSIA 210(b)
RIN 2126-AB17
Stage: Undetermined
Previous Stage: ANPRM: Publication Date 08/25/2009; End of Comment Period 10/26/2009.
Abstract: This rulemaking would consider methods for ensuring a new applicant carrier is knowledgeable about the applicable safety requirements before being granted New Entrant authority. The agency is considering whether to implement a proficiency examination as part of its revised New Entrant Safety Assurance Process as well as other alternatives. This rulemaking responds to issues raised in a petition from Advocates for Highway and Auto Safety regarding new entrant applicant knowledge.
Effects:
  None
Prompting action: Court Action
Legal Deadline: None
Rulemaking Project Initiated: 02/26/2009
Docket Number: FMCSA-2001-11061
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
35. 
Commercial Driver's License Drug and Alcohol Clearinghouse Red
Popular Title: CDL Drug and Alcohol Database
RIN 2126-AB18
Stage: NPRM
Previous Stage: None
Abstract: This rulemaking would create a central database for verified positive controlled substances and alcohol test results for commercial driver´s license (CDL) holders and refusals by such drivers to submit to testing. This rulemaking would require employers of CDL holders and service agents to report positive test results and refusals to test into the database. Prospective employers, acting on an application for a CDL driver position with the applicant's written consent to access the database, would query the database to determine if any specific information about the driver applicant is in the database before allowing the applicant to be hired and to drive CMVs. This rulemaking is intended to increase highway safety by ensuring CDL holders, who have tested positive or have refused to submit to testing, have completed the U.S. DOT´s return-to-duty process before driving CMVs in interstate or intrastate commerce. It is also intended to ensure that employers are meeting their drug and alcohol testing responsibilities.
Effects:
  Economically Significant
Major
Information Collection
Privacy
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 03/01/2009
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/01/2010  02/14/2012   
To OMB 03/01/2010  03/21/2012   
OMB Clearance 05/31/2010  06/21/2012   
Publication Date 06/18/2010  06/25/2012   
End of Comment Period 09/30/2010  08/25/2012   
Explanation for any delay: Additional coordination necessary
Other, higher priorities
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
36. 
Electronic On-Board Recorders and Hours of Service Supporting Documents Red
Popular Title: EOBR and HOS supporting documents
RIN 2126-AB20
Stage: Undetermined
Previous Stage: NPRM: Publication Date 02/01/11; End of Comment Period 04/04/2011, NPRM: Extension of Comment Period 04/13/2011; End of Extended Comment Period 05/23/11.
Abstract: This rulemaking will consider revisions to RIN 2126-AA89 (Electronic On-Board Recorders for Hours of Service Drivers) to expand the number of motor carriers required to install and operate Electronic On-Board Recorders (EOBRs). FMCSA is consolidating this follow-up to the EOBR rule with the Hours Of Service Of Drivers: Supporting Documents rulemaking for development of a single NPRM in RIN 2126-AB20. In addressing Hours of Service Supporting Documents requirements in this new rulemaking, FMCSA will consider reducing or eliminating current paperwork burdens associated with supporting documents in favor of expanded EOBR use. On January 15, 2010, the American Trucking Associations (ATA) filed a Petition for a Writ of Mandamus in the United States Court of Appeals for the District of Columbia Circuit (D.C. Cir. No. 10-1009). ATA petitioned the court to direct FMCSA to issue an NPRM on supporting documents in conformance with the requirements set forth in section 113 of the HMTAA within 60 days after the issuance of the writ and a final rule no later than 6 months after the issuance of the NPRM. The court granted the petition for writ of mandamus on September 30, 2010, ordering FMCSA to issue an NPRM on the supporting document regulations by December 30, 2010. At the request of the agency, the DC Circuit extended the deadline to January 31, 2011. On April 5, 2010, FMCSA issued a final rule (RIN 2126-AA89) that required the use of EOBRs by motor carriers with significant hours-of-service violations (75 FR 17208). A petition for judicial review was filed with the Seventh Circuit. On August 26, 2011, the Court vacated the final rule, which removed the technical specifications relied on in this rulemaking. The Agency is currently evaluating alternatives in continuing this rulemaking, and at this time is uncertain of the rule´s schedule.
Effects:
  Economically Significant
Major
Unfunded Mandate
Regulatory Flexibility Act
Information Collection
Privacy
Prompting action: Court Action
Legal Deadline:  NPRM : 01/31/2011
Rulemaking Project Initiated: 08/26/1994
Docket Number:
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Federal Motor Carrier Safety Administration
37. 
Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report for Intermodal Equipment (RRR) Green
Popular Title: No-Defect DVIR (RRR)
RIN 2126-AB34
Stage: Final Rule
Previous Stage: NPRM: Publication Date 6/7/11; End of Comment Period 8/8/11.
Abstract: This rulemaking would revise a requirement of the FMCSRs that applies to intermodal equipment providers and motor carriers operating intermodal equipment (IME). The rulemaking would delete the requirement for drivers operating IME to submit driver-vehicle inspection reports (DVIRs) when the driver has not found or been made aware of any defects ("no-defect DVIRs"). This rulemaking responds to a joint petition for rulemaking from the Ocean Carrier Equipment Management Association and the Institute of International Container Lessors.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 09/13/2010
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/23/2012  01/23/2012   
To OMB 02/24/2012  02/23/2012   
OMB Clearance 05/28/2012  05/23/2012   
Publication Date 04/11/2012  06/10/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Motor Carrier Safety Administration
38. 
Medical Examiner's Certification Integration Green
Popular Title: Medical Examiner's Certification Integration
RIN 2126-AB40
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would build upon the National Registry (2126-AA97) and Medical Certification (2126-AA10) final rules. This rulemaking would (1) provide for the medical examiner to transmit data from the medical examiner´s certificate through FMCSA to the State Driver Licensing Agencies (SDLAs) for Commercial Driver´s License (CDL) holders and (2) require increased frequency of medical examiner reporting of medical examiner´s certificate data to the National Registry database. This should streamline the process for SDLAs to verify the physical qualifications of CDL holders.
Effects:
  Economically Significant
Major
Information Collection
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 04/20/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 04/17/2012  05/30/2012   
To OMB 05/22/2012  07/04/2012   
OMB Clearance 08/22/2012  10/04/2012   
Publication Date 08/31/2012  10/15/2012   
End of Comment Period 10/31/2012  12/15/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
39. 
Patterns of Safety Violations by Motor Carrier Management Green
Popular Title: Patterns of Safety Violations
RIN 2126-AB42
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would amend FMCSA´s regulations to enable the Agency to prevent interstate transportation by motor carriers that employ officers who have shown unusual and repeated disregard for safety compliance. The rulemaking would define conduct that constitutes a pattern or practice of avoiding compliance or otherwise concealing noncompliance with the Federal Motor Carrier Safety Regulations. These revisions would implement certain provisions of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) and are designed to enhance the safety of commercial motor vehicle (CMV) operations on our nation´s highways.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 08/10/2005
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/26/2012     
To OMB 04/30/2012     
OMB Clearance 07/31/2012     
Publication Date 08/09/2012     
End of Comment Period 10/10/2012     
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Federal Motor Carrier Safety Administration
40. 
Lease and Interchange of Vehicles; Commercial Motor Vehicles Designed to Transport Passengers Yellow
Popular Title: Bus Leasing
RIN 2126-AB44
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would amend the lease and interchange of vehicle regulations in 49 CFR Part 376 to add busses and passenger coaches. FMCSA has been discovering in its passenger bus crash investigations and roadside inspections a need for better documentation of bus equipment lease and interchange agreements. The National Transportation Safety Board (NTSB) has also recommended FMCSA require documentation of bus motor vehicle leases and interchanges based on a crash investigation in 2008 near Victoria, Texas. The rulemaking would determine two things: First, whether any or all of the present practices of motor carriers of passengers, with respect to the performance of transportation by the use of vehicles owned by others, the interchange of vehicles, and the leasing of vehicles to private motor carriers and shippers, should be discontinued because they are contrary to the public interest; and, if any or all of the present practices should be continued. Second, whether the motor carriers´ practices should be governed by regulations similar to those currently in 49 CFR Part 376 applicable presently only to motor carriers of property. The intended effect of this action is to require lessee-motor carriers of passengers to assume complete responsibility for the operation of the bus equipment for the duration of the lease and document full operational control by the lessee-motor carriers of passengers over all drivers, bus vehicles, and trip operations being conducted under its USDOT registration.
Effects:
  Major
Information Collection
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 09/28/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/04/2012  07/17/2012   
To OMB 07/09/2012  08/21/2012   
OMB Clearance 10/09/2012  11/21/2012   
Publication Date 10/20/2012  11/30/2012   
End of Comment Period 12/20/2012  01/31/2013   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Federal Railroad Administration

Federal Railroad Administration
41. 
Critical Incident Stress Plan; "Critical Incident" Definition Red
Popular Title: Critical Incident Stress Plan
RIN 2130-AC00
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would seek to define the term "critical incident." This rulemaking would also seek to define program elements appropriate for the rail environment for certain railroad´s critical incident response programs, so that appropriate action is taken when a railroad employee is involved in or directly witnesses a critical incident.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 11/14/2008
Docket Number: FRA-2008-0131
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/28/2011  10/15/2012   
To OMB 02/09/2012  11/13/2012   
OMB Clearance 05/09/2012  02/11/2013   
Publication Date 05/18/2012  02/15/2013   
End of Comment Period 07/17/2012  04/16/2013   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Railroad Administration
42. 
Training Standards for Railroad Employees (RRR) Red
Popular Title: Training Standards for RR Employees
RIN 2130-AC06
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking will (1) establish minimum training standards for each class or craft of safety-related employee and equivalent railroad contractor and subcontractor employee that require railroads, contractors, and subcontractors to qualify or otherwise document the proficiency of such employees in each such class and craft regarding their knowledge and ability to comply with Federal railroad safety laws and regulations and railroad rules and procedures intended to implement those laws and regulations, etc.; (2) require submission of railroads´, contractors´, and subcontractors´ training and qualification programs for FRA approval; and (3) establish a minimum training curriculum and ongoing training criteria, testing, and skills evaluation measures for track and equipment inspectors employed by railroads and railroad contractor and subcontractors.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline:  Final Rule : 10/16/2009
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2009-0033
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/12/2011  08/08/2011  08/08/2011 
To OMB 08/12/2011  10/07/2011  10/07/2011 
OMB Clearance 11/10/2011  01/06/2012  01/10/2012 
Publication Date 11/21/2011  01/31/2012   
End of Comment Period 01/20/2012  03/31/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Railroad Administration
43. 
Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations (RRR) Red
Popular Title: Vehicle/Track Interaction, High Speed, High Cant
RIN 2130-AC09
Stage: Final Rule
Previous Stage: NPRM: Publication Date 5/10/2010; End of Comment Period 7/9/2010.
Abstract: This rulemaking would amend the Track Safety Standards and Passenger Equipment Safety Standards for high-speed train operations and train operations at high cant deficiencies to promote the safe interaction of rail vehicles with the track over which they operate. It would revise both the safety limits for these operations and the process to qualify them. It accounts for a range of vehicle types that are currently used and may likely be used on future high-speed or high cant deficiency rail operations, and would provide safety assurance for train operations in all classes of track. It is based on the results of simulation studies designed to identify track geometry irregularities associated with unsafe wheel forces and acceleration, thorough reviews of vehicle qualification and revenue service test data, and consideration of international practices.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 06/19/2008
Docket Number: FRA-2009-0036
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/25/2011  01/31/2012   
To OMB 04/01/2011  03/01/2012   
OMB Clearance 06/30/2011  05/30/2012   
Publication Date 07/12/2011  06/07/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Federal Railroad Administration
44. 
Alcohol and Controlled Substance Testing for Maintenance-of-Way Employees Red
Popular Title: Controlled Substance Testing/Maintenance Employees
RIN 2130-AC10
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would revise the Federal Railroad Administration´s alcohol and drug regulations to cover all employees of railroads, railroad contractors, and subcontractors who perform maintenance-of-way activities. The rulemaking would also make other miscellaneous updates to 14 CFR Part 219.
Effects:
  None
Prompting action: Statute
Legal Deadline:  Final Rule : 10/16/2010
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2009-0039
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/08/2009  02/01/2012   
To OMB 10/07/2009  03/01/2012   
OMB Clearance 01/05/2010  05/30/2012   
Publication Date 01/13/2010  06/07/2012   
End of Comment Period 03/15/2010  08/06/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Railroad Administration
45. 
Risk Reduction Program (RRR) Red
Popular Title: Risk Reduction Program
RIN 2130-AC11
Stage: NPRM
Previous Stage: ANPRM: Publication Date 12/08/2010; End of Comment Period 02/07/2011
Abstract: This rulemaking would consider appropriate contents for Risk Reduction Programs and how they should be implemented and reviewed by FRA.
Effects:
  Economically Significant
Major
Prompting action: Statute
Legal Deadline:  Final Rule : 10/16/2012
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2009-0038
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/15/2011  07/30/2012   
To OMB 07/21/2011  08/27/2012   
OMB Clearance 10/19/2011  11/26/2012   
Publication Date 10/27/2011  12/03/2012   
End of Comment Period 12/27/2011  02/01/2013   
Explanation for any delay: Additional coordination necessary
Awaiting development of additional data
Federal Register Citation for NPRM: None


Federal Railroad Administration
46. 
Emergency Escape Breathing Apparatus (RRR) Red
Popular Title: Emergency Escape Breathing Apparatus
RIN 2130-AC14
Stage: Final Rule
Previous Stage: NPRM: Publication Date 10/05/2010, End of Comment Period 12/06/2010.
Abstract: This rulemaking would prescribe regulations that require railroads to provide specified emergency escape breathing apparatus for all crew members in locomotive cabs on freight trains carrying poison-inhalation-hazard hazardous material and provide training in its use.
Effects:
  None
Prompting action: Statute
Legal Deadline:  Final Rule : 04/16/2010
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2009-0044
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/29/2011  02/02/2012   
To OMB 08/04/2011  03/02/2012   
OMB Clearance 11/02/2011  05/31/2012   
Publication Date 11/09/2011  06/07/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Federal Railroad Administration
47. 
High-Speed Rail Corridor Development and Capital Investment Grants to Support Intercity Passenger Rail Service Red
Popular Title: High-Speed Rail Corridor Development
RIN 2130-AC17
Stage: NPRM
Previous Stage: None
Abstract: This rulemaking would prescribe procedures and schedules for the awarding of grants to eligible applicants under this title to assist in financing the capital costs of facilities, infrastructure, and equipment necessary to provide or improve intercity passenger rail transportation.
Effects:
  Economically Significant
Major
Prompting action: Statute
Legal Deadline:  Final Rule - High Speed Development : 10/16/2009
Final Rule - Capital Investment Grants : 10/16/2010
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2009-0106
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/10/2010  12/07/2012   
To OMB 06/07/2010  01/07/2013   
OMB Clearance 09/07/2010  04/08/2013   
Publication Date 09/16/2010  04/15/2013   
End of Comment Period 11/16/2010  06/14/2013   
Explanation for any delay: Additional coordination necessary
Lack of resources
Federal Register Citation for NPRM: None


Federal Railroad Administration
48. 
High-Speed Intercity Passenger Rail (HSIPR) Program; Buy America Program Requirements Green
Popular Title: Buy America Program Requirements
RIN 2130-AC23
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish regulations for FRA´s Buy America requirements as part of the High-Speed Intercity Passenger Rail (HSIPR) program. The Passenger Rail Investment and Improvement Act of 2008 (PRIIA) (Division B of Pub. L. 110-432) authorized the appropriation of funds to establish several new passenger rail grant programs, including capital investment grants to support intercity passenger rail service (§301), high-speed corridor development (§501), and congestion grants (§302). FRA has consolidated these and other closely related programs into the HSIPR program, as detailed in FRA´s HSIPR Interim Guidance (74 Fed. Reg. 29900 (June 23, 2009)) and FY 2010 Interim Guidance (75 Fed. Reg. 38344 and 38365 (July 1, 2010)). Spending authorized under PRIIA is subject to the Buy America provision of 49 U.S.C. § 24405(a). This rulemaking would provide standards to govern FRA´s application of the Buy America provision of 49 U.S.C. § 24405(a) to all PRIIA-authorized spending as part of the HSIPR program.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 09/14/2010
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/21/2012     
To OMB 03/20/2012     
OMB Clearance 06/18/2012     
Publication Date 06/25/2012     
End of Comment Period 08/24/2012     
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Federal Railroad Administration
49. 
Medical Standards for Certified Locomotive Engineers and Conductors Green
Popular Title: Medical Standards for Engineers and Conductors
RIN 2130-AC25
Stage: NPRM
Previous Stage:None
Abstract: FRA is terminating this rulemaking on the regulatory agenda, because there is substantial support that this initiative be issued as medical guidelines rather than as medical standards required by regulation. This rulemaking would create a medical standards program for certified locomotive engineers and conductors to reduce the risk of railroad accidents due to medical conditions that pose a risk of sudden incapacitation. The rulemaking would revise the existing hearing and vision requirements for locomotive engineers in 49 CFR part 240 and apply these requirements to train conductors in 49 CFR part 242 (See Sec. 402 of the Rail Safety Improvement Act of 2008). It would also contain medical standards for the assessment of certain conditions that pose a risk of sudden incapacitation (specifically, stroke, syncope, seizures, cardiovascular disease, insulin-dependent diabetes, and obstructive sleep apnea). These standards, which are being developed by a physicians task force, would be applied by railroad physicians in required triennial and discretionary interim medical assessments of engineers and conductors.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 11/29/2010
Docket Number: FRA-2010-0178
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/28/2012     
To OMB 05/02/2012     
OMB Clearance 07/31/2012     
Publication Date 08/15/2012     
End of Comment Period 10/15/2012     
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Federal Railroad Administration
50. 
Positive Train Control Systems Amendments (RRR) Green
Popular Title: Positive Train Control Systems Amendments (RRR)
RIN 2130-AC27
Stage: Final Rule
Previous Stage: NPRM: Publication Date 08/24/2011; End of Comment Period 10/24/2011.
Abstract: This rulemaking would modify or remove provisions relating to the alternative route analysis and residual risk analysis used to determine whether Positive Train Control System implementation may be avoided.
Effects:
  Economically Significant
Major
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 03/02/2011
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/03/2012     
To OMB 03/12/2012     
OMB Clearance 06/11/2012     
Publication Date 06/18/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Railroad Administration
51. 
Railroad System Safety Program Yellow
Popular Title: Railroad System Safety Program
RIN 2130-AC31
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would improve passenger railroad safety through structured, proactive processes and procedures developed by passenger railroad operators. It would require passenger railroads to establish a System Safety Program that would systematically evaluate and manage risks in order to reduce the number and rates of railroad accidents, incidents, injuries and fatalities. This rulemaking was bifurcated from 2130-AC11.
Effects:
  None
Prompting action: Statute
Legal Deadline:  Final Rule : 10/16/2012
Rulemaking Project Initiated: 10/16/2008
Docket Number: FRA-2011-0060
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/30/2011  03/30/2012   
To OMB 02/07/2012  04/27/2012   
OMB Clearance 05/07/2012  07/26/2012   
Publication Date 05/14/2012  08/15/2012   
End of Comment Period 07/13/2012  10/15/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Railroad Administration
52. 
Positive Train Control Systems: De Minimis Exception, Yard Movements, En Route Failures; Miscellaneous Grade Crossing/Signal and Train Control Amendments (RRR) Green
Popular Title: PTC Amendments Grade Crossing & Signal (RRR)
RIN 2130-AC32
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would revise Positive Train Control regulations by defining the de minimis exception and en route failures, proposing exceptions relating to yard movements that may not be considered on the main line system, and amending regulations governing grade crossing and signal and train control systems. The rulemaking is in response to a petition for rulemaking from the Association of American Railroads.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 06/01/2011
Docket Number: FRA-2011-0061
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/30/2011  03/30/2012   
To OMB 02/07/2012  04/27/2012   
OMB Clearance 05/07/2012  07/26/2012   
Publication Date 05/14/2012  08/01/2012   
End of Comment Period 07/13/2012  10/01/2012   
Explanation for any delay: Awaiting development of additional data
Federal Register Citation for NPRM: None


Federal Transit Administration

Federal Transit Administration
53. 
Capital Project Management Green
Popular Title: Capital Project Management
RIN 2132-AA92
Stage: Final Rule
Previous Stage: ANPRM: Publication Date 09/10/2009; End of C/P 11/09/2009; Extension of C/P 11/10/2009; End of Extended C/P 01/08/2010. NPRM: Publication Date 9/13/2011; End of C/P: 11/14/2011; End of Extended C/P: 12/02/2011
Abstract: This rulemaking would transform the FTA´s Project Management Oversight rule at 49 CFR part 633 into a Capital Project Management rule governing all major capital projects funded under 49 U.S.C. Chapter 53. The rulemaking would consider the appropriate scope of such a rule; the definition of "major capital project"; the management capacity and capability of project sponsors; the requirements for Project Management Plans; the use of risk assessments in project development; and the role and responsibilities of FTA oversight contractors.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 08/10/2005
Docket Number: FTA-2009-0030
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/03/2012     
To OMB 08/01/2012     
OMB Clearance 11/01/2012     
Publication Date 12/04/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Federal Transit Administration
54. 
Bus Testing: Updating Testing Procedures Green
Popular Title: Bus Testing: Updating Testing Procedures
RIN 2132-AB01
Stage: Final Rule
Previous Stage: NPRM: Publication Date 03/14/2011;End of Comment Period 05/13/2011;Extension of Comment Period 05/19/2011;End of Extended Comment Period 06/15/2011.
Abstract: This rulemaking would amend FTA´s bus testing procedures to more accurately reflect passenger loads by updating the average passenger weight to incorporate recent statistical data. This action would affect those transit bus manufacturers who may need to upgrade vehicle components or modify vehicle configurations to better accommodate heavier weight loads.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 01/28/2010
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 10/14/2011  11/02/2011  11/02/2011 
To OMB 11/15/2011  02/10/2012   
OMB Clearance 02/15/2011  05/10/2012   
Publication Date 02/22/2012  05/15/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Federal Transit Administration
55. 
Major Capital Investment Projects (RRR) Red
Popular Title: New Starts (RRR)
RIN 2132-AB02
Stage: NPRM
Previous Stage: ANPRM: Publication Date 6/3/2010; End of Comment Period 8/2/2010.
Abstract: This rulemaking would create a new regulatory framework for FTA´s evaluation and rating of projects seeking funding under the discretionary New Starts and Small Starts programs authorized by 49 U.S.C. 5309. Specifically, the rulemaking would simplify measures for assessing the mobility improvements and cost-effectiveness of projects; would place greater emphasis on the environmental benefits and economic development effects of projects; would clarify the criteria for assessing the local financial commitment of project sponsors; would streamline the evaluation process for projects that remain within a certain envelope of cost and scope during the project development process; and would provide a very quick evaluation process for certain types of projects seeking funding under the Small Starts program.
Effects:
  Economically Significant
Major
Prompting action: Statute
Legal Deadline:  Final Rule by : 04/07/2006
Rulemaking Project Initiated: 03/08/2010
Docket Number: FTA-2010-0009
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/04/2011  02/04/2011  02/14/2011 
To OMB 04/04/2011  04/18/2011  10/03/2011 
OMB Clearance 06/03/2011  01/02/2012  12/27/2011 
Publication Date 06/15/2011  01/16/2012  01/25/2012 
End of Comment Period 08/15/2011  03/16/2012  03/26/2012 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Federal Transit Administration
56. 
Environmental Impact and Related Procedures (RRR) Black
Popular Title: Environmental Impact
RIN 2132-AB03
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish a number of categorical exclusions (CE) from the requirement that an environmental assessment or an environmental impact statement be prepared under section 102 of the National Environmental Policy Act of 1969 (NEPA) for FTA-funded actions. The CEs were developed after an extensive effort, in line with Council on Environmental Quality guidance, to identify activities that FTA believes do not have a significant effect on the environment. The list of CEs includes some overlap with existing CEs, but would provide a tool that would expedite the delivery of transit projects without compromising environmental quality. The rulemaking would also make targeted revisions to the joint FTA-FHWA NEPA regulation that would only apply to FTA and would serve to support FTA´s focus on streamlining its own unique environmental process. These revisions would include: (1) updating the NEPA regulation to provide for electronic means of disseminating information relevant to the NEPA process, (2) removing from the list of projects that normally require an environmental impact statement any fixed guideway transit facility that will be constructed within the existing right-of-way, (3) clarifying timing of the scoping process and procurement of a contractor for preparation of an environmental document, and (4) removing an unnecessary regulatory provision that applied only to New Starts projects.
Effects:
  None
Prompting action: Presidential Direction
Legal Deadline: None
Rulemaking Project Initiated: 09/15/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 11/10/2011    11/08/2011 
To OMB 12/09/2011  01/20/2012  01/12/2012 
OMB Clearance   02/29/2012   
Publication Date 02/02/2012  03/08/2012   
End of Comment Period 04/02/2012  05/08/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Maritime Administration

Maritime Administration
57. 
Regulations To Be Followed by All Departments, Agencies and Shippers Having Responsibility To Provide a Preference for U.S.-Flag Vessels in the Shipment of Cargoes on Ocean Vessels (RRR) Red
Popular Title: Cargo Preference (RRR)
RIN 2133-AB74
Stage: NPRM
Previous Stage: ANPRM: Publication Date 01/28/99; End of Comment Period 03/29/99; Withdrawn 02/14/05
Abstract: This rulemaking would revise and clarify the Cargo Preference rules that have not been revised substantially since 1971. Revisions would include an updated purpose and definitions section along with the removal of obsolete provisions. This rulemaking also would establish a new Part 383 of the Cargo Preference regulations. This rulemaking would cover P.L. 110-417, Section 3511, National Defense Authorization Act for FY2009 changes to the cargo preference rules, which have not been substantially revised since 1971. The rulemaking also would include compromise, assessment, mitigation, settlement, and collection of civil penalties. Originally the agency had two separate rulemakings in process under RIN 2133-AB74 and 2133-AB75. RIN 2133-AB74 would have revised existing regulations and RIN 2133-AB75 would have established a new part 383: Guidance and Civil Penalties and implement P.L. 110-417, Section 3511, National Defense Authorization Act for FY 2009. MARAD has decided it would be more efficient to merge both efforts under one; RIN 2133-AB75 has been merged with this action.
Effects:
  Regulatory Flexibility Act
Information Collection
Foreign
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 06/21/2008
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/15/2008    09/19/2008 
Withdrawn from OST     11/15/2008 
Resubmitted to OST   02/17/2012   
To OMB 10/01/2008  03/19/2012   
OMB Clearance 10/25/2008  06/25/2012   
Publication Date 10/31/2008  07/06/2012   
End of Comment Period 12/31/2008  09/05/2012   
Explanation for any delay: Additional coordination necessary
Unanticipated issues requiring further analysis
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration

National Highway Traffic Safety Administration
58. 
FMVSS No. 124, Accelerator Control Systems Upgrade Red
Popular Title: Accelerator Control Systems - Brake Override
RIN 2127-AK18
Stage: NPRM
Previous Stage:None
Abstract: The agency is considering several revisions to FMVSS No. 124. First, we are considering revisions to the test procedures for vehicles with electronically controlled throttles as well as electric vehicles and hybrid vehicles. These test procedures are the product of several workshops and public meetings. We anticipate that all vehicles would be able to meet them because it would not involve changes to the existing basic requirements of the standard. Second, we are considering adding a new requirement for a brake-throttle override system on light vehicles. Under certain conditions, this would require that the braking system override the throttle control in the event of a conflict. All vehicle manufacturers are in the process of equipping all of their U.S. vehicles with such technology, if they have not done so already. We anticipate that this new requirement would accommodate the current and planned override technologies. This rulemaking is DOT-significant only and will not be reviewed by OMB.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline:  Initiate Rulemaking : 08/28/2009
Rulemaking Project Initiated: 02/12/2008
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/13/2011  01/20/2012   
Publication Date 12/31/2011  02/28/2012   
End of Comment Period 03/03/2012  04/27/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
59. 
Federal Motor Vehicle Safety Standard No. 111, Rearview Mirrors (RRR) Red
Popular Title: Rearview Visibility
RIN 2127-AK43
Stage: Final Rule
Previous Stage: ANPRM: Publication Date 03/04/09; End of Comment Period 05/04/09. NPRM: Publication Date 12/07/2010; End of Comment Period 02/07/2011. NPRM Re-opened Comment Period: Publication Date 03/02/2011; End of Re-opened Comment Period 04/18/2011.
Abstract: This rulemaking would amend Federal Motor Vehicle Standard No. 111; Rearview Mirrors, to reflect requirements contained in the Cameron Gulbransen Kids Transportation Safety Act of 2007. The Act requires that NHTSA expand the required field of view to enable the driver of a motor vehicle to detect areas behind the motor vehicle to reduce death and injury resulting from backing incidents, particularly incidents involving small children and disabled persons. According to the Act, such a standard may be met by the provision of additional mirrors, sensors, cameras, or other technology to expand the driver´s field of view.
Effects:
  Economically Significant
Major
EU
NAFTA
Foreign
Prompting action: Statute
Legal Deadline:  FR per Letter to Congress : 12/31/2011
Initiate rulemaking : 02/28/2009
Final Rule : 02/28/2011
Rulemaking Project Initiated: 02/28/2008
Docket Number: NHTSA-2009-0041
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/10/2011  10/03/2011  10/03/2011 
To OMB 09/24/2011  11/03/2011  11/14/2011 
OMB Clearance 12/23/2011  12/23/2011   
Publication Date 12/31/2011  12/30/2011   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


National Highway Traffic Safety Administration
60. 
Require Installation of Seat Belts on Motorcoaches, FMVSS No. 208 Red
Popular Title: Seat Belts on Motorcoaches
RIN 2127-AK56
Stage: Final Rule
Previous Stage: NPRM: Publication Date 08/18/2010; End Of Comment Period 10/1/2010.
Abstract: This rulemaking would require the installation of lap/shoulder belts in newly-manufactured motorcoaches. Specifically, this rulemaking would establish a new definition for motorcoaches in 49 CFR Part 571.3. It would also amend Federal Motor Vehicle Safety Standard No. 208, Occupant Crash Protection, to require the installation of lap/shoulder belts at all driver and passenger seating positions. It would also require the installation of lap/shoulder belts at driver seating positions of large school buses in FMVSS No. 208. This rulemaking responds, in part, to recommendations made by the National Transportation Safety Board for improving bus safety.
Effects:
  Economically Significant
Major
EU
NAFTA
Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 08/12/2009
Docket Number: NHTSA-2010-0112
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/14/2011  03/14/2012   
To OMB 10/26/2011  04/26/2012   
OMB Clearance 01/25/2012  07/25/2012   
Publication Date 01/30/2012  07/30/2012   
Explanation for any delay: Unanticipated issues requiring further analysis
Federal Register Citation for Final Rule: None


National Highway Traffic Safety Administration
61. 
Alternative Fuel Vehicle Badging and Fuel Compartment Labels on Alternative Fuel Usage Red
Popular Title: Alternative Fuel Usage Labeling & Badging
RIN 2127-AK75
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would respond to requirements of the Energy Independence and Security Act of 2007 (EISA), Title 1, Subtitle A, Section 105, as it amends 49 USC § 32908, to implement Consumer Information and Consumer Education programs related to fuel economy, GHG, other emissions, and alternative fuels. EISA directs the Secretary of Transportation to label vehicles with a permanent and prominent display that an automobile is capable of operating on alternative fuels, and to include in the owner´s manual for vehicles capable of operating on alternative fuels information that describes that capability and the benefits of using alternative fuels, including the renewable nature and environmental benefits of using alternative fuels. Additionally, EISA requires a label to be attached to the fuel compartment of vehicles capable of operating on alternative fuels, with the form of alternative fuel stated on the label. EISA, signed into Law on December 19, 2007, requires that the Secretary issue a final rule not later than 42 months after the date of the enactment.
Effects:
  EU
NAFTA
Foreign
Prompting action: Statute
Legal Deadline:  Final rule : 06/19/2011
Rulemaking Project Initiated: 12/19/2007
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/19/2010  02/17/2012   
To OMB 08/26/2010  03/29/2012   
OMB Clearance 11/25/2010  06/28/2012   
Publication Date 11/30/2010  06/30/2012   
End of Comment Period 01/31/2011  08/30/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
62. 
Tire Fuel Efficiency Consumer Information - Part 2 Red
Popular Title: Tire Fuel Efficiency Part 2
RIN 2127-AK76
Stage: SNPRM
Previous Stage: NPRM: Publication Date 06/22/2009; Comment Period End 08/21/2009.
Abstract: This rulemaking would respond to requirements of the Energy Independence & Security Act of 2007 to establish a national tire fuel efficiency consumer information program for replacement tires designed for use on motor vehicles. On March 30, 2010, NHTSA published a final rule specifying the test procedures to be used to rate the performance of replacement passenger car tires for this new program (75 FR 15893). This rulemaking would address how this information would be made available to consumers. A SNPRM was originally scheduled for 12/31/2011.
Effects:
  EU
NAFTA
Foreign
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 12/19/2007
Docket Number: NHTSA-2011-0099
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 04/03/2012     
To OMB 05/14/2012     
OMB Clearance 08/13/2012     
Publication Date 08/15/2012     
End of Comment Period 10/15/2012     
Explanation for any delay: Awaiting development of additional data
Federal Register Citation for SNPRM: None


National Highway Traffic Safety Administration
63. 
Passenger Car and Light Truck Corporate Average Fuel Economy Standards MYs 2017 and Beyond (RRR) Red
Popular Title: CAFE 2017 and Beyond
RIN 2127-AK79
Stage: NPRM
Previous Stage: Notice of Intent: 10/13/2010. Supplemental Notice of Intent: Publication Date 12/08/2010. Supplemental Notice of Intent: Signed by DOT Secretary and EPA Administrator 7/29/2011.
Abstract: This rulemaking would establish Corporate Average Fuel Economy (CAFE) standards for light trucks and passenger cars for model years 2017 and beyond. This rulemaking would respond to requirements of the Energy Policy and Conservation Act, as amended by the Energy Independence and Security Act of 2007. The statute requires that CAFE standards be prescribed separately for passenger automobiles and non-passenger automobiles to achieve a combined fleet fuel economy of at least 35 mpg by model year 2020. For model years 2021 and beyond, the statute requires that the average fuel economy required to be attained by each fleet of passenger and non-passenger automobiles be the maximum feasible for each model year. The law requires the standards be set at least 18 months prior to the start of the model year. On May 21, 2010, President Obama issued a memorandum directing NHTSA and EPA to conduct a joint rulemaking (NHTSA regulating fuel economy and EPA regulating greenhouse gas emissions), and to issue a Notice of Intent to Issue a Proposed Rule (NOI) by September 30, 2010.
Effects:
  Economically Significant
Major
EIS
EU
NAFTA
Foreign
Prompting action: Statute
Legal Deadline:  Final rule: : 04/01/2015
Rulemaking Project Initiated: 05/27/2010
Docket Number: NHTSA-2010-0131
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/15/2011  10/12/2011  10/14/2011 
To OMB 07/15/2011  10/25/2011  10/14/2011 
OMB Clearance 08/29/2011  11/10/2011  11/16/2011 
Publication Date 09/01/2011  11/15/2011  12/01/2011 
End of Comment Period 11/01/2011  01/30/2012  01/30/2012 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: 76 FR 74854


National Highway Traffic Safety Administration
64. 
Mandatory Part 563 Event Data Recorder Requirements (RRR) Yellow
Popular Title: Mandatory EDR Requirements
RIN 2127-AK86
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish a new Federal motor vehicle safety standard to mandate the installation of Event Data Recorders (EDR) in light vehicles. The standard would incorporate the current 49 CFR Part 563, which established the current reporting requirement of voluntarily installed EDRs in light vehicles. Part 563 presently requires vehicle manufacturers who are voluntarily installing EDRs to be in compliance with the regulation by September 1, 2012. This rulemaking would not affect the 2012 compliance date for voluntarily-installed EDRs. Furthermore, this rulemaking would not modify any of the Part 563 data elements, data capture and format requirements, data retrieval specifications, or data survivability and crash test requirements. Moreover, this rulemaking to mandate EDRs across the entire light vehicle fleet could contribute to advancements in vehicle designs, and advanced restraint and other safety countermeasures. The estimated total incremental costs associated with this rulemaking would be $24.4 million (2009 dollars), which is measured from a baseline of 91.6 percent EDR installation to 100 percent installation, assuming the sale of 15.5 million light vehicles per year.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 02/22/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/15/2011  09/20/2011  09/13/2011 
To OMB 07/26/2011  01/03/2012  02/01/2012 
OMB Clearance 10/25/2011  04/03/2012   
Publication Date 10/31/2011  04/13/2012   
End of Comment Period 12/31/2011  06/13/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
65. 
Upgrade of Event Data Recorder Requirements Red
Popular Title: Light Vehicle Upgrade of EDR Requirements
RIN 2127-AK87
Stage: Undetermined
Previous Stage:None
Abstract: This rulemaking would expand the utility of the amount and type of data Event Data Recorders (EDRs) capture in light vehicles in the event of a crash. The rulemaking would consider requiring some of the optional data elements specified in 49 CFR Part 563. Part 563 established the current reporting requirement of voluntarily installed EDRs in light vehicles. In addition, this rulemaking would make revisions to the optional data elements to account for the latest advances in vehicle safety. Part 563 presently requires vehicle manufacturers who are voluntarily installing EDRs to be in compliance with the regulation by September 1, 2012. In a separate rulemaking (2127-AK86 Mandatory Part 563 Event Data Recorder Requirements), the agency would propose requiring that all light vehicles comply with the requirements specified in current 49 CFR 563. This rulemaking would seek additional information from the public and expand upon that initiative. Moreover, this rulemaking would contribute to advancements in vehicle designs, advanced restraints and other safety countermeasures. The costs are expected to be minimal since some vehicle manufacturers presently capture additional data beyond Part 563 in their EDRs. Originally, an ANPRM was scheduled for 12/31/2011.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 02/22/2011
Docket Number:
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: Lack of resources
Federal Register Citation for Undetermined: None


National Highway Traffic Safety Administration
66. 
Heavy Vehicle Speed Limiters Red
Popular Title: Heavy Vehicle Speed Limiters
RIN 2127-AK92
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would respond to petitions from ATA and Roadsafe America to require the installation of speed limiting devices on heavy trucks. In response, NHTSA requested public comment on the subject and received thousands of comments supporting the petitioner’s request. Based on the available safety data and the ancillary benefit of reduced fuel consumption, this rulemaking would consider a new Federal Motor Vehicle Safety Standard that would require the installation of speed limiting devices on heavy trucks. We believe this rule would have minimal cost, as all heavy trucks already have these devices installed, although some vehicles do not have the limit set. This rule would decrease the estimated 8991 fatalities caused by crashes involving heavy trucks and buses. It would also increase the fleet fuel efficiency of these vehicles.
Effects:
  Economically Significant
Major
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 03/18/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/11/2011  04/11/2012   
To OMB 09/24/2011  05/24/2012   
OMB Clearance 12/23/2011  08/23/2012   
Publication Date 12/31/2011  08/30/2012   
End of Comment Period 03/02/2012  10/30/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
67. 
Sound for Hybrid and Electric Vehicles Green
Popular Title: Quieter Vehicles Sound Alert
RIN 2127-AK93
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would respond to The Pedestrian Safety Enhancement Act of 2010, which directs the Secretary of Transportation to study and establish a motor vehicle safety standard that provides for a means of alerting blind and other pedestrians of motor vehicle operation. NHTSA is conducting research in this area and has not yet developed an estimate for the potential costs and benefits associated with this rulemaking action.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline:  Initiate rulemaking: : 07/05/2012
Final Rule: : 01/03/2014
Rulemaking Project Initiated: 03/18/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/14/2012     
To OMB 03/27/2012     
OMB Clearance 06/27/2012     
Publication Date 07/05/2012     
End of Comment Period 09/05/2012     
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
68. 
Motorcoach Rollover Structural Integrity Red
Popular Title: Motorcoach Rollover Structural Integrity
RIN 2127-AK96
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would promulgate a new FMVSS for rollover structural integrity requirements for motorcoaches. In August 2007, NHTSA published a motorcoach safety plan identifying four specific priority items: seat belts on motorcoaches, rollover structural integrity, emergency evacuation, and fire safety. The DOT published a comprehensive motorcoach safety action plan in November 2009 that reiterated NHTSA’s motorcoach safety priorities. This rulemaking also addresses 6 recommendations issued by the NTSB on motorcoach roof strength and structural integrity.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 03/18/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/12/2011  10/28/2011  11/10/2011 
To OMB 09/23/2011  01/26/2012   
OMB Clearance 12/23/2011  04/25/2012   
Publication Date 12/30/2011  04/30/2012   
End of Comment Period 03/02/2012  06/30/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
69. 
Electronic Stability Control Systems for Heavy Vehicles Red
Popular Title: Truck Tractor Electronic Stability Control
RIN 2127-AK97
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would promulgate a new Federal standard that would require stability control systems on truck tractors and motorcoaches that address both rollover and loss of control crashes, after an extensive research program to evaluate the available technologies, an evaluation of the costs and benefits, and a review of manufacturer´s product plans. Rollover and loss of control crashes involving heavy vehicles is a serious safety issue that is responsible for 304 fatalities and 2,738 injuries annually. They are also a major cause of traffic tie-ups, resulting in millions of dollars of lost productivity and excess energy consumption each year. Suppliers and truck and motorcoach manufacturers have developed stability control technology for heavy vehicles to mitigate these types of crashes. Our preliminary estimate produces an effectiveness range of thirty-seven to fifty-six percent against single-vehicle tractor-trailer rollover crashes and three to fourteen percent against loss of control crashes that result from skidding on the road surface. With these effectiveness estimates, annually, we estimate 29 - 66 lives would be saved, 517 - 979 MAIS 1-5 injuries would be reduced, and 810 - 1,693 crashes that involved property damage only would be eliminated. Additionally, it would save $10 - $26 million in property damage and travel delays. Based on the technology unit costs and affected vehicles, we estimate technology costs would be $55 to 107 million, annually. However, the costs savings from reducing travel delay and property damage would produce net benefits of $128 - $372 million.
Effects:
  Economically Significant
Major
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 03/18/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/11/2011  08/12/2011  09/28/2011 
To OMB 06/23/2011  11/25/2011  12/09/2011 
OMB Clearance 09/23/2011  03/30/2012   
Publication Date 09/30/2011  04/30/2012   
End of Comment Period 11/30/2011  06/30/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
70. 
FMVSS No. 218 and Enforcement Policy Concerning Novelty Helmets Green
Popular Title: Novelty Helmets Enforcement
RIN 2127-AL01
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would establish an enforcement policy regarding novelty motorcycle helmets. These are helmets that are currently not certified by their manufacturers as being compliant with FMVSS No. 218. This rulemaking would also add an appendix to FMVSS No. 218 to serve as a guide for motorcyclists and local law enforcement personnel in identifying compliant motorcycle helmets.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 04/21/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 10/12/2011  03/12/2012   
To OMB 11/23/2011  04/23/2012   
OMB Clearance 02/22/2012  07/22/2012   
Publication Date 02/29/2012  07/30/2012   
End of Comment Period 04/30/2012  09/30/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


National Highway Traffic Safety Administration
71. 
Part 571 FMVSS No. 205, Glazing Materials, GTR (RRR) Green
Popular Title: Window Glazing (RRR)
RIN 2127-AL03
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would enhance FMVSS No. 205 by adopting a Global Technical Regulation (GTR), which contains updated performance tests for glazing materials that are composed of glass, laminated glass, or glass faced with plastic compared to what is currently in FMVSS No. 205. The tests in the GTR would allow manufacturers to achieve efficiencies in the certification process while not degrading safety or imposing new burdens.
Effects:
  EU
NAFTA
Foreign
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 04/22/2011
Docket Number:
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/13/2012  03/13/2012   
To OMB 03/26/2012  04/26/2012   
OMB Clearance 06/25/2012  07/25/2012   
Publication Date 06/30/2012  07/30/2012   
End of Comment Period 08/29/2012  09/29/2012   
Explanation for any delay: Other, higher priorities
Federal Register Citation for NPRM: None


Office of the Secretary

Office of the Secretary
72. 
Protection of Sensitive Security Information Red
Popular Title: SSI-TSA
RIN 2105-AD59
Stage: Undetermined
Previous Stage: Interim Final Rule: Publication Date 05/18/2004; End of Comment Period 07/19/2004.
Abstract: This rulemaking would finalize a May 2004 interim final rule and respond to any comments received on that action. This is a joint rulemaking between DOT and the Transportation Security Administration. A final rule was originally scheduled for 10/31/06.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 09/02/2002
Docket Number: TSA-2003-15569
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Undetermined: None


Office of the Secretary
73. 
Prioritization and Allocation Authority Exercised By the Secretary of Transportation Under the Defense Production Act Red
Popular Title: Defense Production Act (DPA)
RIN 2105-AD83
Stage: Final Rule
Previous Stage: NPRM: Publication Date 02/15/2011; End of Comment Period 03/17/2011.
Abstract: This rulemaking would clarify the prioritization and allocation authorities exercised by the Secretary of Transportation under the Defense Production Act (DPA). The DPA is the President´s primary authority to ensure timely availability of private sector resources for national defense. In addition to military and energy activities, the definition of "national defense" includes emergency preparedness activities conducted pursuant to Title VI of The Robert T. Stafford Disaster Relief and Emergency Assistance Act and the protection and restoration of critical infrastructure. Under Title I of the DPA, the President has the authority to require the acceptance and prioritization of contracts and orders -- and to allocate materials, services, and facilities -- in support of the national defense. Under Section 201 of Executive Order 12919, the President has delegated these prioritization and allocation authorities to the Secretary of Transportation for all forms of civil transportation. In the 2009 DPA reauthorization legislation, Congress mandated that each Federal agency with delegated authority under Title I of the DPA develop final rules that establish standards and procedures for implementing its delegated authority in emergency and nonemergency conditions. Additionally, Congress mandated that, to the extent practicable, the rules be consistent and unified. DOT is part of an interagency working group, along with the other delegated agencies, that is developing consistent unified rules.
Effects:
  Information Collection
Prompting action: Statute
Legal Deadline:  Final rule : 06/27/2010
Rulemaking Project Initiated: 01/07/2009
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 09/15/2011  09/22/2011  08/18/2011 
To OMB 10/17/2011  11/17/2011  11/17/2011 
OMB Clearance 01/17/2012  01/09/2012   
Publication Date 01/31/2012  01/23/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Office of the Secretary
74. 
Use of the Seat-Strapping Method for Carrying a Wheelchair on an Aircraft Yellow
Popular Title: Seat-Strapping
RIN 2105-AD87
Stage: Final Rule
Previous Stage: NPRM: Publication Date 06/03/2011; End of Comment Period 08/02/2011.
Abstract: This rulemaking would address whether carriers should be allowed to utilize the seat-strapping method to stow a passenger´s wheelchair in the aircraft cabin.
Effects:
  Regulatory Flexibility Act
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 04/30/2009
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 11/09/2011  04/02/2012   
To OMB 12/21/2011  04/30/2012   
OMB Clearance 03/20/2012  07/30/2012   
Publication Date 04/03/2012  08/13/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Office of the Secretary
75. 
Stowage of Wheelchairs, other Mobility Aids and other Assistive Devices Red
Popular Title: Stowage and Assistive Devices
RIN 2105-AD90
Stage: Undetermined
Previous Stage: NPRM: Publication Approved ;Publication Date ;End of Comment Period .
Abstract: This rulemaking would amend 14 CFR Part 382 (Part 382) by including Subpart I (14 CFR 382.121-382.133) in the list of subparts with which a U.S. carrier must comply with respect to passengers traveling under its code on flights operated by a foreign carrier between two foreign points. This rulemaking would also amend Part 382 to eliminate the labeling requirements for FAA approved portable oxygen concentrators and specify that ventilators, respirators and Continuous Positive Airway Pressure (CPAP) machines must be allowed for use in the passenger cabin as long as they comply with applicable safety, security, and hazardous materials rules. In addition, this rule would amend the provision in Part 382 that allows carriers to require a passenger who wishes to use an FAA-approved portable oxygen concentrator in the aircraft cabin to provide a medical certificate dated within 10 days of the passenger´s initial flight.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 03/02/2009
Docket Number:
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Undetermined: None


Office of the Secretary
76. 
Accessibility of Airports Green
Popular Title: Accessibility of Airports
RIN 2105-AD91
Stage: Final Rule
Previous Stage: NPRM: Publication Date 09/29/2011; End of Comment Period 11/28/2011.
Abstract: The rulemaking would include new provisions related to service animal relief areas and closed captioning of televisions and audio-visual displays for airports that mirror the new requirements applicable to airlines set forth in the amended 14 CFR Part 382. It would also reorganize the provision in 49 CFR Part 27 regarding lifts used to transfer disabled passengers to and from the tarmac.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 01/03/2009
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 07/23/2012     
To OMB 08/20/2012     
OMB Clearance 11/19/2012     
Publication Date 12/04/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Office of the Secretary
77. 
Accessibility of Carrier Websites and Ticket Kiosks Green
Popular Title: ACAA SNPRM 1
RIN 2105-AD96
Stage: Final Rule
Previous Stage: NPRM: Publication Date 06/08/2010; Comment Period End 08/09/2010. SNPRM: Publication Date 09/26/2011; End of Comment Period 11/25/2011; Extension of Comment Period 11/21/2011; End of Extended Comment Period 01/09/2012.
Abstract: This rulemaking was divided into two successive Air Carrier Access Act (ACAA) rulemakings. This one, as well as the second rulemaking (2105-AE12), address issues raised in another rulemaking RIN: 2105-AD92. This rulemaking would consider: (1) the cost and technical issues involved in requiring carrier website accessibility; and (2) whether automated kiosks operated by carriers at airports and elsewhere should be required to be accessible. After the public comment periods, we intend to consolidate the final decisions in this rulemaking and RIN: 2105-AE12 into one document.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 09/15/2009
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/07/2012     
To OMB 06/08/2012     
OMB Clearance 09/07/2012     
Publication Date 09/14/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Office of the Secretary
78. 
Smoking of Electronic Cigarettes On Commercial Aircraft Red
Popular Title: E-Cigarette
RIN 2105-AE06
Stage: Final Rule
Previous Stage: NPRM: Publication Date 09/15/2011; End of Comment Period 11/14/2011.
Abstract: This rulemaking would amend the general regulatory language in 14 CFR Part 252 to explicitly ban the smoking of electronic cigarettes on air carrier and foreign air carrier flights in scheduled intrastate, interstate, and foreign air transportation.
Effects:
  Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 11/04/2010
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 04/10/2012     
To OMB 05/08/2012     
OMB Clearance 08/06/2012     
Publication Date 08/20/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Office of the Secretary
79. 
Enhancing Airline Passenger Protections III Red
Popular Title: Airline Psgr. Protections III
RIN 2105-AE11
Stage: SNPRM
Previous Stage: NPRM: Publication Date 12/08/2008; Comment Period End 02/06/2009. NPRM Extension of Comment Period: Publication date 02/06/2009; Extension of Comment Period End 03/09/2009.
Abstract: This rulemaking would address the following issues: (1) whether the Department should require a marketing carrier to provide assistance to its code-share partner when a flight operated by the code-share partner experiences a lengthy tarmac delay; (2) whether the Department should enhance disclosure requirements on code-share operations, including requiring on-time performance data, reporting of certain data code-share operations, and codifying the statutory amendment of 49 U.S.C. 41712(c) regarding website schedule disclosure of code-share operations; (3) whether the Department should expand the on-time performance "reporting carrier" pool to include smaller carriers; (4) whether the Department should require travel agents to adopt minimum customer service standards in relation to the sale of air transportation; (5) whether the Department should require ticket agents to disclose the carriers whose tickets they sell or do not sell and information regarding any incentive payments they receive in connection with the sale of air transportation; (6) whether the Department should require ticket agents to disclose any preferential display of individual fares or carriers in the ticket agent’s internet displays; (7) whether the Department should require additional or special disclosures regarding certain substantial fees, e.g., oversize or overweight baggage fees; (8) whether the Department should prohibit post-purchase price increase for all services and products not purchased with the ticket or whether it is sufficient to prohibit post-purchase prices increases for baggage charges that traditionally have been included in the ticket price; and (9) whether the Department should require that ancillary fees be displayed through all sale channels.
Effects:
  Regulatory Flexibility Act
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 04/18/2011
Docket Number:
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/30/2011  04/17/2012   
To OMB 09/30/2011  05/18/2012   
OMB Clearance 12/30/2011  08/02/2012   
Publication Date 01/06/2012  08/10/2012   
End of Comment Period 03/06/2012  10/10/2012   
Explanation for any delay: Awaiting development of additional data
Federal Register Citation for SNPRM: None


Office of the Secretary
80. 
Carrier-Supplied Medical Oxygen, Accessible In-Flight Entertainment Systems, Service Animals, and Accessible Lavatories on Single-Aisle Aircraft Red
Popular Title: ACAA SNPRM 2
RIN 2105-AE12
Stage: SNPRM
Previous Stage: NPRM: Publication Date 06/08/2010; Comment Period End 08/09/2010.
Abstract: This rulemaking is the one of two successive Air Carrier Access Act (ACAA) rulemakings that address issues raised in another rulemaking RIN: 2105-AD92. The second rulemaking is RIN: 2105-AD96. This rulemaking action would consider (1) whether there are safety-related reasons for excluding service animals other than dogs that may be specific to foreign carriers; (2) whether the cost of requiring carriers to supply free in-flight medical oxygen would create an undue burden; and (3) whether providing high-contrast captioning on in-flight entertainment displays is technically and economically feasible. It would also address accessible lavatories on single-aisle aircraft and a rulemaking petition from the Psychiatric Service Dog Society to eliminate provisions allowing carriers to require documentation and 48 hours advance notice for users of psychiatric service animals, and miscellaneous service animal issues. After the public comment periods, we intend to consolidate the final decisions in this rulemaking and RIN: 2105-AD96 into one document.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 04/25/2011
Docket Number:
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/27/2011  04/04/2012   
To OMB 07/30/2011  04/20/2012   
OMB Clearance 10/25/2011  07/20/2012   
Publication Date 10/31/2011  07/27/2012   
End of Comment Period 12/31/2011  09/27/2012   
Explanation for any delay: Other, higher priorities
Unanticipated issues requiring further analysis
Federal Register Citation for SNPRM: None


Office of the Secretary
81. 
Transportation for Individuals with Disabilities: Reasonable Modification Green
Popular Title: ADA: Reasonable Accommodation
RIN 2105-AE15
Stage: Final Rule
Previous Stage: None.
Abstract: This action continues a rulemaking initiated under RIN 2105-AD54. It would add to the Department´s ADA regulations a requirement, parallel to that in other DOT and Department of Justice ADA rules, that regulated entities reasonably modify policies and practices where necessary to ensure nondiscriminatory transportation services for individuals with disabilities, except where doing so would fundamentally alter the service.
Effects:
  None
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 02/06/2006
Docket Number:
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 04/15/2012     
To OMB 05/15/2012     
OMB Clearance 08/15/0201     
Publication Date 08/31/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Pipeline and Hazardous Materials Safety Administration

Pipeline and Hazardous Materials Safety Administration
82. 
Hazardous Materials; Combination Packages Containing Liquids Intended for Transport by Aircraft Red
Popular Title: Air Packaging
RIN 2137-AE32
Stage: Final Rule
Previous Stage: ANPRM: Publication 7/07/2008; End of Comment Period 9/5/2008. NPRM: Publication 5/14/2010; End of Comment Period 7/13/2010.
Abstract: Incident data and testing conducted on behalf of DOT indicate many combination packagings authorized for the transportation of hazardous materials may not withstand conditions normally incident to air transportation. PHMSA is considering measures to reduce the incidence of package failures and to minimize the consequences of failures should they occur. This rulemaking would require additional measures to verify packaging integrity, such as performance testing, and revisions to packaging requirements, such as the addition of liners or absorbent material.
Effects:
  EU
NAFTA
Foreign
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 06/04/2007
Docket Number: PHMSA-07-29364
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 01/21/2011  01/24/2012   
To OMB 02/16/2011  02/17/2012   
OMB Clearance 05/17/2011  05/17/2012   
Publication Date 05/24/2011  05/25/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for Final Rule: None


Pipeline and Hazardous Materials Safety Administration
83. 
Hazardous Materials: Bulk Loading and Unloading Operations Yellow
Popular Title: Loading/Unloading
RIN 2137-AE37
Stage: Final Rule
Previous Stage: NPRM: Publication Date 03/11/2011; End of Comment Period 05/10/2011. End of extended Comment Period 06/09/2011.
Abstract: This rulemaking would amend the Hazardous Materials Regulations to require each person (i.e., carrier or facility) who engages in cargo tank loading or unloading operations to perform a risk assessment of the loading and unloading operation and develop and implement safe operating procedures based upon the results of the risk assessment. These amendments would include the operational procedures requirements to address several aspects of loading and unloading, including provisions for facilities to develop maintenance testing programs for transfer equipment (i.e., hose maintenance programs) used to load or unload cargo tank motor vehicles (CTMVs). In addition, this rulemaking would require each employee who engages in cargo tank loading or unloading operations to receive training and be evaluated on the employee´s qualifications to perform loading or unloading functions. This rulemaking would reduce the risk associated with the loading and unloading of cargo tank motor vehicles that contain hazardous materials.
Effects:
  Information Collection
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 10/28/2008
Docket Number: PHMSA-2007-28119
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/26/2011  03/29/2012   
To OMB 02/02/2012  04/26/2012   
OMB Clearance 05/02/2012  07/25/2012   
Publication Date 05/11/2012  08/06/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Pipeline and Hazardous Materials Safety Administration
84. 
Pipeline Safety: Enforcement of State Excavation Damage Laws Red
Popular Title: Pipeline Safety: Excavation Damage Laws
RIN 2137-AE43
Stage: NPRM
Previous Stage: ANPRM: Publication 10/29/2009; End of Comment Period 12/14/2009.
Abstract: The PIPES Act provides PHMSA with the authority to enforce excavation damage laws in those states that have inadequate enforcement. This rulemaking would consider standards for excavators and operators to follow when conducting excavation in a vicinity of a pipeline and the administrative procedures to be used for enforcement proceedings.
Effects:
  None
Prompting action: Statute
Legal Deadline: None
Rulemaking Project Initiated: 03/30/2009
Docket Number: PHMSA 2009-0192
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/01/2011  05/06/2011  06/02/2011 
To OMB 04/04/2011  09/21/2011  09/22/2011 
OMB Clearance 07/05/2011  12/21/2011   
Publication Date 07/12/2011  12/30/2011   
End of Comment Period 09/13/2011  03/04/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Pipeline and Hazardous Materials Safety Administration
85. 
Hazardous Materials: Revisions to Requirements for the Transportation of Lithium Batteries Red
Popular Title: Transportation of Lithium Batteries
RIN 2137-AE44
Stage: SNPRM
Previous Stage: NPRM: Publication Date 1/11/2010; End of Comment Period 3/12/2010.
Abstract: This rulemaking would amend the Hazardous Materials Regulations to comprehensively address the safe transportation of lithium cells and batteries. The intent of the rulemaking is to strengthen the current regulatory framework by imposing more effective safeguards, including design testing to address risks related to internal short circuits, and enhanced packaging, hazard communication, and operational measures for various types and sizes of lithium batteries in specific transportation contexts. The rulemaking responds to several recommendations issued by the National Transportation Safety Board.
Effects:
  Regulatory Flexibility Act
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 03/26/2009
Docket Number: PHMSA-2009-0095
Dates for SNPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/20/2010    07/22/2011 
Returned to Mode     08/25/2011 
Returned To OST   01/18/2012  12/13/2011 
To OMB 09/23/2010  01/26/2012   
OMB Clearance 07/18/2011  04/26/2012   
Publication Date 07/29/2011  05/07/2012   
End of Comment Period 09/29/2011  07/07/2012   
Explanation for any delay: N/A
Federal Register Citation for SNPRM: None


Pipeline and Hazardous Materials Safety Administration
86. 
Hazardous Materials: Combustible Liquids Red
Popular Title: Combustible Liquids
RIN 2137-AE52
Stage: Undetermined
Previous Stage: ANPRM: Publication Date 04/05/2010; End of Comment Period 07/06/2010.
Abstract: This rulemaking would consider the transportation of combustible liquids and whether the Hazardous Materials Regulations (HMR) should harmonize domestic regulations with international standards. Additionally, it would examine ways to revise, clarify, or relax certain regulatory requirements to facilitate the transportation of combustible liquids while maintaining an adequate level of safety. Previously, an NPRM had been scheduled for 01/23/2012.
Effects:
  EU
NAFTA
Foreign
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 01/30/2009
Docket Number: PHMSA-2009-0241
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Pipeline and Hazardous Materials Safety Administration
87. 
Hazardous Materials: Safety Requirements for External Product Piping on Cargo Tanks Transporting Flammable Liquids (Wetlines) Yellow
Popular Title: Wetlines
RIN 2137-AE53
Stage: Final Rule
Previous Stage: NPRM: Publication Date 01/27/2011; End of Comment Period 03/28/2011. NPRM: Extension of Comment Period 03/17/2011; End of Extended Comment Period 04/27/2011.
Abstract: The rulemaking would amend the Hazardous Materials Regulations to prohibit flammable liquids from being transported in unprotected product piping on existing and newly manufactured DOT specification cargo tank motor vehicles.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 09/01/2009
Docket Number: PHMSA-2009-0303
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 12/26/2011  03/29/2012   
To OMB 02/02/2012  04/26/2012   
OMB Clearance 05/02/2012  07/25/2012   
Publication Date 05/11/2012  08/06/2012   
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None


Pipeline and Hazardous Materials Safety Administration
88. 
Pipeline Safety: Safety of On-Shore Liquid Hazardous Pipelines Red
Popular Title: Liquid Hazardous Pipelines
RIN 2137-AE66
Stage: NPRM
Previous Stage: ANPRM: Publication Date 10/18/2010; Extension of Comment Period 01/04/2011; End of Comment Period 01/18/2011; End of Extended Comment Period 02/18/2011.
Abstract: This rulemaking would address effective procedures that hazardous liquid operators can use to improve the protection of High Consequence Areas (HCA) and other vulnerable areas along their hazardous liquid onshore pipelines. PHMSA is considering whether changes are needed to the regulations covering hazardous liquid onshore pipelines, whether other areas should be included as HCAs for integrity management (IM) protections, what the repair timeframes should be for areas outside the HCAs that are assessed as part of the IM program, whether leak detection standards are necessary, valve spacing requirements are needed on new construction or existing pipelines, and PHMSA should extend regulation to certain pipelines currently exempt from regulation. The agency would also address the public safety and environmental aspects any new requirements, as well as the cost implications and regulatory burden.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 08/13/2010
Docket Number: PHMSA-2010-0229
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 11/18/2011  01/19/2012   
To OMB 12/16/2011  02/17/2012   
OMB Clearance 03/19/2012  05/15/2012   
Publication Date 03/30/2012  05/25/2012   
End of Comment Period 05/30/2012  07/25/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Pipeline and Hazardous Materials Safety Administration
89. 
Hazardous Materials: Revision of Requirements for Fireworks Approvals Red
Popular Title: Fireworks Approvals
RIN 2137-AE70
Stage: NPRM
Previous Stage: None
Abstract: This rulemaking would amend the HMR by revising and clarifying requirements for the examination, testing, certification, and transportation of fireworks. This action would include consolidating the fireworks requirements into one section, limiting fireworks approvals to manufacturers only, requiring manufacturers to assign a unique "product identification number" to each firework, require 1.3G and 1.4G fireworks to be examined by authorized test labs, and implement an on-line application process.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 09/27/2010
Docket Number: PHMSA-2010-0320
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 08/22/2011  05/15/2012   
To OMB 09/29/2011  06/12/2012   
OMB Clearance 12/30/2011  09/10/2012   
Publication Date 01/19/2012  09/20/2012   
End of Comment Period 04/19/2012  11/19/2012   
Explanation for any delay: Additional coordination necessary
Federal Register Citation for NPRM: None


Pipeline and Hazardous Materials Safety Administration
90. 
Pipeline Safety: Excess Flow Valves In Applications Other Than Single-Family Residences in Gas Distribution Systems Red
Popular Title: Excess Flow Valves
RIN 2137-AE71
Stage: ANPRM
Previous Stage: ANPRM: 11/25/2011; End of C/P 2/18/2012
Abstract: This rulemaking would require excess flow valves (EFVs) be installed in all new and renewed gas service lines, for structures other than single family dwellings, when the operating conditions are compatible with readily available valves. These changes would be in response to NTSB and PHMSA investigations of current EFV installation practices. The intended effect of the rule is to increase the level of safety for structures other than single family dwellings currently subject to Federal pipeline safety regulation. This rulemaking was recently upgraded to significant.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 10/01/2010
Docket Number: PHMSA-2011-0009
Dates for ANPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 06/02/2011    07/29/2011 
To OMB 06/30/2011  09/16/2011  09/26/2011 
OMB Clearance 07/14/2011  11/04/2011  11/02/2011 
Publication Date 07/25/2011  11/17/2011  11/25/2011 
End of Comment Period 10/25/2011  01/19/2012  02/18/2012 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for ANPRM: None


Pipeline and Hazardous Materials Safety Administration
91. 
Pipeline Safety: Gas Transmission Red
Popular Title: Gas Transmission
RIN 2137-AE72
Stage: ANPRM
Previous Stage:None
Abstract: In this rulemaking PHMSA will be revisiting the requirements in the Pipeline Safety Regulations addressing integrity management principles for Gas Transmission pipelines. In particular, PHMSA will be reviewing the definition of an HCA ( including the concept of a potential impact radius), the repair criteria for both HCA and non-HCA areas, requiring the use of automatic and remote controlled shut off valves, valve spacing, and whether applying the integrity management program requirements to additional areas would mitigate the need for class location requirements.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 01/04/2011
Docket Number: PHMSA-2011-0023
Dates for ANPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/23/2011    06/03/2011 
To OMB 06/20/2011  07/22/1011  07/14/2011 
OMB Clearance 07/05/2011  08/04/2011  08/15/2011 
Publication Date 07/14/2011  08/15/2011  08/25/2011 
End of Comment Period   11/22/2011  12/02/2011 
Extension of Comment Period     11/16/2011 
End of Extended Comment Period     01/20/2012 
Explanation for any delay: Additional coordination necessary
Federal Register Citation for ANPRM: 76 FR 5308


Pipeline and Hazardous Materials Safety Administration
92. 
Hazardous Materials: Miscellaneous Amendments (RRR) Green
Popular Title: Miscellaneous Amendments (HM-218G) (RRR)
RIN 2137-AE78
Stage: NPRM
Previous Stage:None
Abstract: This rulemaking would update and clarify existing requirements by incorporating changes into the Hazardous Materials Regulations (HMR) based on PHMSA´s own initiatives through an extensive review of the HMR and previously issued letters of interpretation. Specifically, among other provisions, PHMSA would provide for the continued use of approvals until final administrative action is taken, when a correct and completed application for approval renewal was received 60 days prior to expiration date; update various entries in the hazardous materials table and the corresponding special provisions; clarify the lab pack requirements for temperature controlled materials; correct an error in the HMR with regard to the inspection of cargo tank motor vehicles containing corrosive materials; and revise the training requirements to require that hazardous materials employers ensure their hazardous materials employee training records are available upon request to an authorized official of the Department of Transportation or the Department of Homeland Security.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 04/08/2011
Docket Number: PHMSA-2011-0138
Dates for NPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 02/29/2012  05/29/2012   
To OMB 03/29/2012  06/28/2012   
OMB Clearance 06/29/2012  09/28/2012   
Publication Date 07/05/2012  10/05/2012   
End of Comment Period 09/03/2012  12/03/2012   
Explanation for any delay: N/A
Federal Register Citation for NPRM: None


Pipeline and Hazardous Materials Safety Administration
93. 
Hazardous Materials: Miscellaneous Pressure Vessel Requirements (DOT Spec Cylinders) (RRR) Green
Popular Title: Pressure Vessels (RRR)
RIN 2137-AE80
Stage: ANPRM
Previous Stage: None
Abstract: This rulemaking would revise certain requirements of the Hazardous Materials Regulations (HMR) applicable to the manufacture, maintenance, and use of DOT specification cylinders. These revisions clarify certain important safety requirements, incorporate industry consensus standards and, where appropriate, decrease the regulatory burden without compromising the safe transportation of compressed gases in commerce. This rulemaking responds to eleven petitions for rulemaking, incorporates two special permits into the HMR and addresses the National Transportation Safety Board (NTSB) Recommendation I-93-1. Among other provisions, PHMSA would provide requirements for the transport of fire suppression systems, clarify cylinder specification and requalification requirements, and adopt new and update current incorporations by reference of industry consensus standards issued by the Compressed Gas Association.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 04/15/2011
Docket Number: PHMSA-2011-0140
Dates for ANPRM:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 05/22/2012     
To OMB 06/22/2012     
OMB Clearance 08/01/2012     
Publication Date 08/15/2012     
End of Comment Period 10/15/2012     
Explanation for any delay: N/A
Federal Register Citation for ANPRM: None


Pipeline and Hazardous Materials Safety Administration
94. 
Hazardous Materials: Reverse Logistics (RRR) Black
Popular Title: Reverse Logistics (RRR)
RIN 2137-AE81
Stage: Undetermined
Previous Stage: None
Abstract: This rulemaking would address changes to the Hazardous Materials Regulations (HMR) that are applicable to reverse logistics. The issue of reverse logistics involves the transportation of hazardous materials that have been damaged or returned from the retailer to a return center. Specifically, the rulemaking would establish a regulatory definition of ´reverse logistics´ and outline the responsibilities of those that offer hazardous materials returned by retail customers.
Effects:
  None
Prompting action: 2011 Retrospective Regulatory Review
Legal Deadline: None
Rulemaking Project Initiated: 04/08/2011
Docket Number:
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Pipeline and Hazardous Materials Safety Administration
95. 
Hazardous Materials: Harmonization with the UN Recommendations, International Maritime Dangerous Goods Code, and International Civil Aviation Organization Technical Instructions, Response to Appeals; Clarifications; Corrections Black
Popular Title: Harmonization Response to Appeals
RIN 2137-AE83
Stage: Undetermined
Previous Stage:None
Abstract: This rulemaking would respond to several administrative appeals received in response to our January 19, 2011 (HM-215K; 76 FR 3308) international harmonization final rule, which made revisions to the Hazardous Materials Regulations to maintain alignment with various international standards. Specifically, it incorporated amendments based on the sixteenth revised edition of the United Nations Recommendations on the Transport of Dangerous Goods - Model Regulations, Amendment 35-10 to the International Maritime Dangerous Goods Code, and the 2011-2012 International Civil Aviation Organization´s Technical Instructions on the Safe Transport of Dangerous Goods by Air. This rulemaking would consider the merits of the administrative appeals received and consider amendments to the HMR.
Effects:
  None
Prompting action: None
Legal Deadline: None
Rulemaking Project Initiated: 08/19/2011
Docket Number:
Dates for Undetermined:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST      
To OMB      
OMB Clearance      
Publication Date      
End of Comment Period      
Explanation for any delay: N/A
Federal Register Citation for Undetermined: None


Research and Innovative Technology Administration

Research and Innovative Technology Administration
96. 
Reporting Ancillary Airline Passenger Revenues Green
Popular Title: Reporting Ancillary Airline Passenger Revenues
RIN 2139-AA13
Stage: Final Rule
Previous Stage: NPRM: Publication Date 07/15/2011; End of Comment Period 09/13/2011.
Abstract: This rulemaking would collect more detailed revenue information regarding airline imposed fees from those air carriers meeting the definition of "large certificated air carriers." Many air carriers have adopted fees for such services as checked baggage, carry-on baggage, meals, on-board entertainment, internet connections, pillows, blankets, early boarding, canceling or changing reservations, unaccompanied minors, pet transportation, etc. The rulemaking would also change the way the Department computes mishandled baggage rates from mishandled baggage reports per domestic enplanement to mishandled bags per checked bags.
Effects:
  Information Collection
Prompting action: Secretarial/Head of Operating Administration Decision
Legal Deadline: None
Rulemaking Project Initiated: 10/01/2010
Docket Number: RITA 2011-0001
Dates for Final Rule:
MilestoneOriginally
Scheduled
Date
New
Projected
Date
Actual
Date
To OST 03/21/2012     
To OMB 04/25/2012     
OMB Clearance 07/25/2012     
Publication Date 07/31/2012     
Explanation for any delay: N/A
Federal Register Citation for Final Rule: None